Work
The first paver paves the pavement for 28 hours. Second for 26 hours. I started the first paver and, after 2 hours, joined the second. How long will they finish the pavement?
Final Answer:

Tips for related online calculators
Check out our ratio calculator.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebrabasic operations and conceptsUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Worker floor time
Three workers were to lay the parquet floor. If everyone worked alone, the first would finish the job in 30 hours, the second in 24 hours, and the third in 20 hours. How long will they do the floor if they work together? - Paver square shifts
Seven pavers would pave the square in 15 shifts. After five shifts, two pavers fell ill. How long will it take for the remaining pavers to finish the job? - Total Sidewalk Area
The pavers paved 1/8 of the total area of the sidewalk on the first day. On the second day, they paved 20 square meters of pavement. In both two days, they paved 50 square meters of sidewalks. Calculate the total area of the sidewalk. - Walkers
Two walkers simultaneously started against each other from places A and B. After the meeting, both continued to B. The Second walker came to B 2.3 hours before the first walker. Its speed is 1.7 times the speed of the first pedestrian. How many hours went - Garden mowing
Eva will mow the garden in 4 hours, and Doubravka will cut it in 3 hours. How long would it take to mow the garden if Eva started an hour earlier and only Doubravka joined it? - Sapling planting calculation
In the forest, there are 84 workers employed in planting saplings. Working 10 hours a day, they would finish the job in 24 days. After 7 days, 14 workers leave. How long will it take the others to finish planting the saplings if they work 12 hours a day f - Workshops
The first workshop will complete the robot itself in 15 days, and the second workshop in 10 days. They started together, but only the second workshop worked after three days. Thus, the work will take 15 days.