Work
The first paving machine can pave a pavement in 28 hours, and the second in 26 hours. The first machine started working, and after 2 hours the second machine joined it. How long after the second machine starts will they finish the job together?
Final Answer:

Tips for related online calculators
Check out our ratio calculator.
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebrabasic operations and conceptsUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Paving 2
A construction company needs 8 working days to pave the pavements on two streets if all 6 pavers work. However, only 4 pavers are available because the other two have been reassigned. How many working days will it take the group of 4 pavers to complete th - Work in factory
45 men can complete a work in 16 days, but after some days they started working 30 more men joined them and completed the remaining work in 6 days. How many days after the commencement of the job did 30 men join? - Tiler pool together
The first tiler would tile the pool inside in 5 working hours; the second would need 7 working hours for the same job. How long would it take them to tile the pool inside together if the second tiler starts working on the pool 12 minutes later than the fi - Two machines
The first machine can produce parts in 24 hours, and the second can produce parts in 16 hours. The first started working at 6:00 p.m., and the second at 10:00 a.m. At what hour were all the parts made? - Workers
Four workers plan to work on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take the remaining three workers to finish the job? - Sapling planting calculation
In the forest, there are 84 workers employed in planting saplings. Working 10 hours a day, they would finish the job in 24 days. After 7 days, 14 workers leave. How long will it take the others to finish planting the saplings if they work 12 hours a day f - Jana Petra windows
Jane can wash 20 windows alone in 4 hours. Petra can do the same job in 6 hours. How long will it take them working together?