Floating floor

In the new building is considered a floating floor worker in each room. 30 minutes lay 9 m2 of the floor. How long 3 workers laid the floor in 4 rooms with a total area of 90 m2?


x =  100 min


Solution in text x =

Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!

Do you want to convert area units?

Next similar examples:

  1. Forestry workers
    forestry_workers In the forest is employed 64 laborers planting trees in nurseries. For 8 hour work day would end job in 35 days. After 12 days, 20 laborers go forth. How many days is needed to complete a planting trees in nurseries by others, if they will work 9 hours a
  2. Greenhouses
    sklenik Two workers would make installation of greenhouses for 54 hours. For how many hours does the installation 9 workers?
  3. Pizza 5
    pizza_8 You have 2/4 of a pizza and you want to share it equally between 2 people how much pizza does each person get?
  4. Supermarket cashiers
    tesco_1 When at the supermarket are opened only 2 cash people waiting in the front approximately 12 minutes. How many will shorten the average waiting time in a front where supermarket open another three cashiers?
  5. Janitor
    snow Janitor tosses 26 cm layer of snow on the school grounds for 90 minutes. How many friends would have to call for help if snow needs to have bowled for 15 minutes. We assume that at the same time bow all the same amount of snow.
  6. Tablecloth
    decka I embroider tablecloth in 20 days but if I embroider 3/4 hours a day I have embroider it for 15 days. How long do I embroider a day?
  7. Pumps
    fuel_tank 6 pump fills the tank for 3 and a half days. How long will fill the tank 7 equally powerful pumps?
  8. Painting
    natieranie Jožko with Fero painted the bench for four hours. How many hours would take work if four friends help him?
  9. On the farm
    cows On the farm were housed 70 heads of cattle with food supply for 180 days. After 60 days, 10 head of cattle sold, and for the next 30 days they sold 10 more. How many days is sufficient supply of feed for the remaining cattle?
  10. Excavation
    vykop_ryha Mr. Billy calculated that excavation for a water connection dig for 12 days. His friend would take 10 days. Billy worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of excavation they met?
  11. Cows
    kravy0 20 cows has food for 60 days. We reduce the dose to two-thirds for 18 cows. How many days will be fed?
  12. Pumps 3
    pump_water Two pumps of the same power fill the garden pool for 10 hours. How many of these pumps would have to use if we want to shorten the filling of the pool to four hours?
  13. Trrops - soldiers
    troops Food stocks will last 20 soldiers of the 4-day training. How many days they could extend training if four soldiers become sick?
  14. Garden
    garden_2 Father dig up the garden in 9 hours. Son in 13 hours. How many hours take dig up the garden together?
  15. Master and apprentice
    painters_1 Master painted the roof in 3 hours and apprentice for 4 hours. How many of roof they painted in hour and how many in three quarters of an hour?
  16. Cubes into cuboid
    cubes_21 How many 12 centimeter cubes fit into the block (cuboid) with 6dm, 8,4dm and 4,8?
  17. Rectangular prism
    kvader11_2 If i have a rectangular prism with a length of 1,000 cm, width of 30 cm and a height of 50 cm, what is the volume?