Floating floor

In the new building is considered a floating floor worker in each room. 30 minutes lay 9 m2 of the floor. How long 3 workers laid the floor in 4 rooms with a total area of 90 m2?

Correct result:

x =  100 min

Solution:

x=30/9 90/3=100 min



We would be pleased if you find an error in the word problem, spelling mistakes, or inaccuracies and send it to us. Thank you!






Showing 0 comments:
avatar




Next similar math problems:

  • Two rooms
    clean_1 Woman cleans the room in 30 minutes a man in 90 minutes. How long will take they clean two rooms?
  • The carpet
    koberec_1 How many meters of carpet 90 cm wide need to cover floor room which has a rectangular shape with a lengths 4.8 m and 2.4 m if the number of pieces on the carpet is needed to be lowest?
  • On the floor 2
    floor2 The floor area of a living room is 9 7/9 m2. A carpet with an area of 5 5/8 m2 is placed on the floor. Find the area of the room is not covered with carpet.
  • Four workers
    wood_6 Four workers lay the gym floor in six hours. After an hour of working together, one of the workers went to the doctor. How long will it take for the remaining three workers to complete their work?
  • Parquet floor
    Parkett Three workers laid parquet floor for 2.301 hour. The first one would do this work alone 7 hours, the second in 6 hours. For how many hours would fulfill this work the third worker, if he worked alone?
  • Trevor
    tiles2_1 Trevor wishes to tile the floor of his bathroom. The bathroom is rectangular and is 4.2m long and 3.3m wide. The tiles are 30cm by 30cm. Calculate the cost to tile the floor if each tile costs 72 cents.
  • Eight masons
    time Eight masons will plaster a wall with an area of 1440 m2 in 9 days. They work 8 hours a day. How much area will plaster 6 masons in 4 hours?
  • The orchard
    jablone 4 temporary workers harvested the orchard in 9 days. How many temporary workers we need for six days?
  • Tablecloth
    decka I embroider tablecloth in 20 days but if I embroider 3/4 hours a day I have embroider it for 15 days. How long do I embroider a day?
  • Six workers
    workers Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do 7 workers earn in 10 days with the same daily average salary?
  • Weighted harmonic average
    workers_3 Ten workers will do some work in 2 minutes, five workers in 10 minutes and three workers in 6 minutes. How many minutes per average worker per worker?
  • Six painters
    painter_1 Six painters paint an area of 120 m2 in 4 hours. How long does it take for 12 painters to paint 480 m2 with the same performance?
  • Forestry workers
    forestry_workers In the forest is employed 56 laborers planting trees in nurseries. For 8 hour work day would end job in 37 days. After 16 days, 9 laborers go forth? How many days are needed to complete planting trees in nurseries by others if they work 10 hours a day?
  • Greenhouses
    sklenik Two workers would make installation of greenhouses for 54 hours. For how many hours does the installation 9 workers?
  • Tiles
    tiles_1 The room has dimensions 12 m and 5.6 m. Determine the number of square tiles and their largest possible size to cover them room's floor.
  • Tmp workers
    profesiadays Three temporary workers cleaned 60 m of walkway in 5 hours. How many meters of the walkway cleared seven volunteers for eight hours?
  • Hurry - rush
    bus_3 At an average speed 7 km/h I will come from the school to the bus stop for 30 minutes. How fast I need to go if I need to get to the bus stop in 21 minutes?