Floating floor

In the new building is considered a floating floor worker in each room. 30 minutes lay 9 m2 of the floor. How long 3 workers laid the floor in 4 rooms with a total area of 90 m2?

Correct answer:

x =  100 min

Step-by-step explanation:

x=30/9 90/3=100 min



We will be pleased if You send us any improvements to this math problem. Thank you!






avatar




Related math problems and questions:

  • Two rooms
    clean_1 Woman cleans the room in 30 minutes a man in 90 minutes. How long will take they clean two rooms?
  • Four workers
    wood_6 Four workers lay on the gym floor in six hours. After an hour of working together, one of the workers went to the doctor. How long will it take for the remaining three workers to complete their work?
  • On the floor 2
    floor2 The floor area of a living room is 9 7/9 m2. A carpet with an area of 5 5/8 m2 is placed on the floor. Find the area of the room that is not covered with carpet.
  • Weighted harmonic average
    workers_3 Ten workers will do some work in 2 minutes, five workers in 10 minutes and three workers in 6 minutes. How many minutes per average worker per worker?
  • Parquet floor
    Parkett Three workers laid parquet floor for 2.301 hour. The first one would do this work alone 7 hours, the second in 6 hours. For how many hours would fulfill this work the third worker, if he worked alone?
  • Workers
    two_workers Two workers A and B, will be done work together for 15 days. They worked together for 13.5 days. Then A worker became ill, and worker B finish the job alone for 7.5 days. If every worker was working alone, how many days took whole work for worker A and B?
  • Six workers
    workers Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do 7 workers earn in 10 days with the same daily average salary?
  • Tiles
    tiles_1 The room has dimensions 12 m and 5.6 m. Determine the number of square tiles and their largest possible size to cover them room's floor.
  • Hurry - rush
    bus_3 At an average speed 7 km/h, I will come from the school to the bus stop for 30 minutes. How fast I need to go if I need to get to the bus stop in 21 minutes?
  • Floor
    map_mierka The floor area of ​​the room is 31 m2 and has a width of 4.3 m. How many centimeters of circumference measured the floor on the map at the scale 1:75?
  • Janitor
    snow Janitor tosses 26 cm layer of snow on the school grounds for 90 minutes. How many friends would have to call for help if snow needs to have bowled for 15 minutes? We assume that at the same time bow all the same amount of snow.
  • Forestry workers
    forestry_workers In the forest is employed 56 laborers planting trees in nurseries. For 8 hour work day would end job in 37 days. After 16 days, 9 laborers go forth? How many days are needed to complete planting trees in nurseries by others if they work 10 hours a day?
  • Two workers
    Frog Two workers together execute some work in 10 days. The first worker would have done himself in 20 days. How many days would have done himself a second worker?
  • Road repair
    workers_1 Road repair took 10 days for 36 workers if they worked 9 hours a day. How many days take repair same road 37 workers if they work 8 per day?
  • Worker's performance
    plot 15 workers paint 180 m fence in 3 days. In how many days will 9 workers paint a 360 m fence? We assume that each worker have the same, constant and unchangeable performance.
  • Greenhouses
    sklenik Two workers would make installation of greenhouses for 54 hours. For how many hours does the installation 9 workers?
  • The carpet
    koberec_1 How many meters of carpet 90 cm wide need to cover floor room which has a rectangular shape with a lengths 4.8 m and 2.4 m if the number of pieces on the carpet is needed to be lowest?