Tony works

Tony works as a welder for a construction company. His hourly wage is $15.51 and he works 40 hours per week. Tony gets a paid vacation each year. The construction company is doing well and has plenty of work for the next year. Tony can expect to work the entire year.

Tony wants to create a budget and needs to calculate his yearly earnings

Result

w =  32260.8 USD

Solution:

Solution in text w =







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




To solve this example are needed these knowledge from mathematics:

Next similar examples:

  1. Three people
    clocks_16 Three people start doing a work at a same time. The first worked only 2 hours. The second ended 3 hours before the end. On an individual basis, it would take the first time to do the work 10 hours, second 12 hours and 15 hours third. How many hours did it.
  2. Four workers
    wood_6 Four workers will lay the floor of the gym in six hours. After an hour of working together, one of the workers left to the doctor. How long before the remaining three workers finish their work?
  3. Pumps
    pumps_8 After the floods, four equally powerful pumps exhausted water from the flooded cellar in 6 hours. How many hours would take a drained out with three equally powerful pumps?
  4. Athletic competition
    runners_7 In a 400 meter athletic competition, a participant covers the distance as given below. find the average speed? first 80 meters 10 m/s next 240 meters 7.5 m/s last 80 meters 10 m/s
  5. Jane plants
    flowers_8 Jane plants flowers in the garden. If she planted 12 every hour instead of 9 flowers, she would finish with the job an hour earlier. How many flowers does she plant?
  6. Constant motion
    car_36 The car has undergone constant motion 120 km in 1 hour 30 minutes. Determine its average speed. Determine how long car drove in the first 20 minutes and 50 minutes from the start of the move.
  7. Uphill and downhill
    cyclist_49 The cyclist moves uphill at a constant speed of v1 = 10 km/h. When he reaches the top of the hill, he turns and passes the same track downhill at a speed of v2 = 40 km/h. What is the average speed of a cyclist?
  8. Gravitation
    vodorovny_vrh From the top of the 80m high tower, the body is thrown horizontally with an initial speed of 15 m/s. At what time and at what distance from the foot of the tower does the body hit the horizontal surface of the Earth? (use g = 10 ms-2)
  9. Four pavers
    tiles2_4 Four pavers would pave the square in 18 days. How many pavers do you need to add to done work in 12 days?
  10. Rocket start
    freefall1 The body launched vertically up returns to the start site in 6 seconds. What height did it have?
  11. The work
    clock-night-schr_17 The work was to be done by 150 workers. At the beginning of their work, their number reduced by 40, which increased the time of work by 5 and 1/3 of the schedule. How long did work take?
  12. Lumberjacks
    stromy_17 Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if 5 workers added to it after 4 days?
  13. Ten cashiers
    pokladna Ten cashiers are open at Tesco. Customers wait an average of 15 minutes. How many other cashiers have to open to reduce the waiting time by 4 minutes?
  14. Velocipedes
    Velocipede In the 19th century, bicycles did not have a chain drive, and the pedals were connected directly to the wheel axis. This wheel diameter gradually increased until the so-called high bicycles (velocipedes) with a front wheel diameter of up to 1.5 meters, whi
  15. Flowerbed
    flowers_9 Ondra digs the bed in 20 minutes. Cuba in 30 minutes. For how long do they dig together?
  16. Five mechanics
    car_37 Five mechanics will make a car for some time. How many cars can 30 mechanics produce at the same time?
  17. Pump
    pumps_9 680 liters of water were pumped in 8 minutes. How many liters was spent in 56 minutes?