Temporary workers
Three temporary workers work in the warehouse and unload the goods in 9 hours. At what time would five temporary workers unload the same products?
Correct answer:

Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
arithmeticbasic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Workers 54253
Four workers packed the goods with the same output in 6 hours. In how many hours would five workers do the same job? Express it in hours and minutes.
- Products 37321
Eight workers produce 2048 products per shift. In how many hours would ten workers produce the same amount of products? (shift is 8 hours)
- Part-timers
Six part-timers would take seven hours to pick strawberries. How long would this work take if two more temporary workers were added after three hours?
- Summerjob
Temporary workers Franta ties a sheaf of hay in 20 minutes, Lojza only a quarter in the same time. How many sheaves do they tie together in 8 hours?
- Calculate 67814
Two workers work in a workshop to produce the same product. The first worker worked 184 hours per month and produced 656 pieces of the product. The second worker worked 177 hours per month and produced 830 pieces of products. Calculate the hourly output o
- Workers 4719
Workers unload the wagon in 3 1/2 hours. How much will it land in 2 hours?
- Two workers
One worker makes a part 4 hours and the second 9 hours later than they would make the same part together. How long does it take for each worker to make the part himself?