Temporary workers

Three temporary workers work in the warehouse and unload the goods in 9 hours. In what time would five temporary workers unload the same products?

Correct answer:

t =  5.4 h

Step-by-step explanation:

t=3 9/5=275=275 h=5.4 h



We will be pleased if You send us any improvements to this math problem. Thank you!



avatar




Tips to related online calculators
Do you want to convert time units like minutes to seconds?

Related math problems and questions:

  • Tmp workers
    profesiadays Three temporary workers cleaned 60 m of walkway in 5 hours. How many meters of the walkway cleared seven volunteers for eight hours?
  • Seven workers
    wood Seven workers clear the glade in 22 hours. How many workers would need to be done in 8 hours?
  • The orchard
    jablone 4 temporary workers harvested the orchard in 9 days. How many temporary workers we need for six days?
  • Greenhouses
    sklenik Two workers would make installation of greenhouses for 54 hours. For how many hours does the installation 9 workers?
  • Working time
    work_1 At 10 hours work shift, work is done in 16 days. How many days will the work be done at 8 hours shifts?
  • Machines 2
    machine_1 2 machines for 50 hours produces 2,000 products. How many machines need to buy to make in 30 hours 15,000 products?
  • Forestry workers
    forestry_workers In the forest is employed 56 laborers planting trees in nurseries. For 8 hour work day would end job in 37 days. After 16 days, 9 laborers go forth? How many days are needed to complete planting trees in nurseries by others if they work 10 hours a day?
  • Road repair
    workers_1 Road repair took 10 days for 36 workers if they worked 9 hours a day. How many days take repair same road 37 workers if they work 8 per day?
  • In the bakery
    chlieb In 2.25 hours, 24 pieces of bread are baked in the bakery. How many breads are baked in the bakery in 6 hours and 45 minutes?
  • Six workers
    workers Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do 7 workers earn in 10 days with the same daily average salary?
  • The work
    clock-night-schr_17 The work was to be done by 150 workers. At the beginning of their work, their number reduced by 40, which increased the time of work by 5 and 1/3 of the schedule. How long did work take?
  • Six students
    painter Two pupils painted the class in four hours. How long will it take for six pupils?
  • Workers
    work_9 9 workers dig a canal 120 meters long for eight hours. For how long would be dig five workers canal 200 meters long?
  • Workers
    zamkova_dlazba Ten workers must pave road street for 22 working days. After four days were for speeding up work added two more workers. a) After how many work days now workers completes the paved road? b) How many working days it took a total paved road?
  • Pumps 3
    pump_water Two pumps of the same power fill the garden pool for 10 hours. How many of these pumps would have to use if we want to shorten the filling of the pool to four hours?
  • Workers
    two_workers Two workers A and B, will be done work together for 15 days. They worked together for 13.5 days. Then A worker became ill, and worker B finish the job alone for 7.5 days. If every worker was working alone, how many days took whole work for worker A and B?
  • Parquet floor
    Parkett Three workers laid parquet floor for 2.301 hour. The first one would do this work alone 7 hours, the second in 6 hours. For how many hours would fulfill this work the third worker, if he worked alone?