Defective product standard
The factory sets a standard that 2% of products may be defective. Last week, out of 1,250 products, 32 were defective. By how many defective products was the standard exceeded?
Final Answer:

Tips for related online calculators
Our percentage calculator will help you quickly and easily solve a variety of common percentage-related problems.
You need to know the following knowledge to solve this word math problem:
basic operations and conceptsGrade of the word problem
Related math problems and questions:
- Production plan
The annual production plan was exceeded by 2%. If production were higher by 300 products, the plan would be exceeded by 5%. What was the annual production plan? - Tile defect probability
The factory produces 35% of the tiles on line A, which produces scrap with a probability of 0.02, and 65% on line B, where the probability of scrap is 0.03. What is the probability that the selected tile will be defective? - Egg Delivery Plan Variance
The poultry farm supplied 50,000 eggs per year. According to the plan, it was supposed to deliver 20% of the annual task in April and 16% in May. In April, it exceeded the monthly plan by 830 eggs; in May, it failed to deliver 260 eggs against the plan. W - Seedling standard
Three gardeners planted 3,555 seedlings in one day. The first met the standard. The second exceeded the standard by 120 seedlings and the third by 135 seedlings. What was the daily norm? - Probability
In a batch of 500 products, there are 10 rejects. In a statistical inspection, 40 products are checked, which are randomly selected from a batch, and the selection is made without repetition. The batch is considered satisfactory if there is at most one de - Scrap
From 18 products are 5 scraps. What is the probability that the random pick of 2 products has no defective product? - Machine production calculation
In the factory, they produced 1,500 products a week on five machines. How many machines do they need to produce 2,000 products a week?
