Work time
Michael would cut the fence himself in 12 hours. It would take Michael and George 8 hours together. Determine how long it would take for George to do the job.
Final Answer:

Tips for related online calculators
Looking for calculator of harmonic mean?
Looking for a statistical calculator?
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Looking for a statistical calculator?
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
statisticsalgebraUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Work time
Josef would do the work himself in 5 hours. Josef and Michal would do the work together in 3.5 hours. Determine how long it would take Michal to do the job independently. - Worker job hours
Five workers do a job in 20 hours. How long will it take two workers to do the same job? - Two Tractors Field Time
One tractor driver would mow the field in 15 hours. Another tractor driver would do the same job in 12 hours. How long will it take them to do the work together if the latter starts plowing two hours later than the former? - Jerrie
Jerrie can repair her car in 1 1/12 hours. A mechanic can do the same job in 8/12 hours. How much longer does it take Jerrie to do the job? - Work time
Milos would do the work himself in 5 hours. How much would it take Dan to do the job together in two hours? - Welders
The welder does the job for six hours, the second one for 8 hours. How long do the job third welder, if all together can do the job in 2 hours? - Worker floor time
Three workers were to lay the parquet floor. If everyone worked alone, the first would finish the job in 30 hours, the second in 24 hours, and the third in 20 hours. How long will they do the floor if they work together?