Harvesters 4498
The first combine harvester will harvest the fields in 12 hours, and the second combine harvester in 8 hours. How long does it take for the same harvester to harvest the 3rd combine if all three harvesters harvest together in 2 hours?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- One combine
One combine harvester can harvest a field of corn in 4.5 hours. Another harvester can harvest the same field in 3 hrs. If the farmer uses the two harvesters at the same time. How long will it take to harvest the entire field? - Harvesters 5853
One combine harvester harvests a wheat field in 12 hours, and another combine harvester in 16 hours. How long does the same field harvest the third combine harvester alone if all three harvesters harvest the wheat field in 2 hours? - Harvesters
The first harvester will harvest the grain from the field in 20 hours, and the second, the more powerful in 10 hours. How long will it take to harvest this field by both harvesters if the second harvester has to be set up first, which takes 2 hours? The f - Harvesters
The first harvester reaps the grain from the land for 24 hours, and the second harvester for 16 hours. How many hours will it take to harvest by two harvesters, but the second harvester started working four hours later than the first?
- Neighboring 19293
Farmers had three harvesters at their disposal during the harvest, with which they would harvest the fields in 9 hours. How long will it take them if two more harvesters from the neighboring district come to help them? - Harvesters
Five combine harvesters harvest wheat in 12 days. How much will the harvest time be shortened when six combine harvesters enter the field? - Harvesters 14703
Five combine harvesters shit in 12 days. How long does a 2-fold larger field of combine harvesters take?