The bricklayer
The bricklayer built a six-meter base of the fence in 3 hours. How long does it take to build a 14 meters long base?
Final Answer:

Tips for related online calculators
You need to know the following knowledge to solve this word math problem:
basic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Plot - wire mesh
In your yard, you want to build a garden that you want to fence. On the boundary of the plot, a fence 16 meters long is built. We have no more wire mesh for the fence. What area in square meters will the fenced garden have if it has the shape of a rectang - Bricklayer apprentice wall
A bricklayer and an apprentice can build a wall together in 6 hours. Working alone, the bricklayer would finish 5 hours sooner than the apprentice. How long would it take the bricklayer to build the wall by himself? - Wall building time
During the reconstruction of the apartment, the bricklayer built three-fifths of the wall in three-quarters of an hour. How much time does it take to build two walls? - Painters
Six of the painters paint 90 m of the fence in five hours. For how long would the four painters paint a 45-meter fence? How many meters of the fence were painted by painters 5 for two hours? - Double ladder
The double ladder is 8.5 m long. It is built so that its lower ends are 3.5 meters apart. How high does the upper end of the ladder reach? - Bricklayers
The first bricklayer would build a wall in 3 days, the second in 4 days. The first bricklayer worked alone for a day, then the second bricklayer came to his aid and finished the work together. How long did it take to build the wall? - House plot trapezoid
The Douglases will build a house. Their plot is a trapezoid with bases 42 m and 18 m long, and the distance between the bases is 23 m. According to the project, the house will have a built-up area of 146 m². How many square meters of land will remain unde
