Material improvement
Material in a factory was originally enough for two workshops for 20 days. After implementing an efficiency improvement, the same material lasted 25 days. How many days will the material last for 5 workshops now? How many extra days of work do the saved materials provide with the new methods?
Final Answer:

Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
basic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Two Workshops Joint Work
In one workshop, they will do the given work in 15 days; in another workshop, where more members work, they will do the given work in 10 days. After three days of joint work, only the larger workshop continued the assigned work. In how many days will he f - Material transport
Two trucks were supposed to load the building materials in 10 days. After 6 days of work, the first car broke down, and the second one carried building materials for another 9 days. How many days would the first and second cars take the building materials - Three workshops
One workshop can complete the task in 48 days, the second in 30 days, and the third in 20 days. In how many days would the task be completed if all workshops worked? - Installation team
The team of installers is to carry out the installation in 20 days. By adding two fitters from the beginning of the work, the assembly was completed in 15 days. How many workers were originally on the team? - Merchant
The merchant lowered cost by 10% in December when it was not sold. Again, in January, it lowered costs by 20% and now costs 576 €. A. How much did the goods stand originally? B. How much do the goods cost after the first lowering? C. How much percent of t - Factory light savings
The factory hall is lit by 76 light bulbs, each of which has an input of 200 W. Determine how much electrical work will be saved annually if the light is on an average of 100 minutes less per day. Consider 260 business days. - The raw
The raw data presented here are the scores (out of 100 marks) of a market survey regarding the acceptability of a new product launched by a company for a random sample of 50 respondents: 40 45 41 45 45 30 30 8 48 25 26 9 23 24 26 29 8 40 41 42 39 35 18 25