Material improvement
Material in a factory was originally enough for two workshops for 20 days. After implementing an efficiency improvement, the same material lasted 25 days. How many days will the material last for 5 workshops now? How many extra days of work do the saved materials provide with the new methods?
Final Answer:

Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
basic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Three workshops
One workshop can complete the task in 48 days, the second in 30 days, and the third in 20 days. In how many days would the task be completed if all workshops worked? - Merchant
The merchant lowered cost by 10% in December when it was not sold. Again, in January, it lowered costs by 20% and now costs 576 €. A. How much did the goods stand originally? B. How much do the goods cost after the first lowering? C. How much percent of t - Factory light savings
The factory hall is lit by 76 light bulbs, each of which has an input of 200W. Determine how much electrical work will be saved annually if the light is on an average of 100 minutes less per day. Consider 260 business days. - The raw
The raw data presented here are the scores (out of 100 marks) of a market survey regarding the acceptability of a new product launched by a company for a random sample of 50 respondents: 40 45 41 45 45 30 30 8 48 25 26 9 23 24 26 29 8 40 41 42 39 35 18 25 - A truck 2
A truck leaves the home with building materials and makes a return trip every six days. To deliver all the materials, you need eight truck trips every month. How many trucks do you need? - Painter fence work
Two painters are painting the factory fence together. If everyone worked alone, the first would finish the job in 16 days, the second in 20 days. When will they finish the work together? - Two Workshops Production Days
Two workshops of a particular company produced 25 parts a day. To have 300 pieces, one worked for ten days and the other for 15 days. How many parts did each workshop make per day?