On the construction site of a new housing estate in Kladno-Kročehlavy, students from the state labor reserve carried out machine plastering of the masonry. 5 students plastered 10 square meters more masonry than 6 plasterers who plastered by hand. Together, they plastered 960 square meters of masonry. What was the average performance of one worker with each method of plastering?
Correct answer:

Tips for related online calculators
Do you have a system of equations and are looking for calculator system of linear equations?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebraplanimetricsUnits of physical quantitiesthemes, topicsGrade of the word problem
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Double-performance 17931
Excavation work was carried out by nine double-performance machines, which excavated 420 meters of excavation in one day. How many were there if the more powerful machine excavated 420 meters in a week (7 days) and the less powerful engine excavated 280 m
- Three-room 6033
There are three sizes of apartments in the new building on the housing estate. One-sixth of the total number of apartments are four-room apartments, and one-third of the rest are two-room apartments. There are 160 three-room apartments. How many four-room
- Plastered 2529
The mason was to plaster 24.2 m² of the wall in 12 shifts. At what percentage did he meet the plan when plastering 306 m² of walls?
- Identical 22233
They will compete on four stages in 8 hours by 42 meters more than on twenty identical stages per hour. How many meters of fabric are woven per hour in one state?
- Performance 66764
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick. a) In how many more shifts did the masons complete the said plastering? b) In how many shifts was the assigned
- Three friends
Petra was ill with three friends, each on a different day. Find out which day, who came, and what they handled. They came in three consecutive days a week. The first came on Tuesday. Karol did not come on Tuesday. Mirko arranged to change the date of the
- Panel house
The construction company has two groups of workers. Group A has more members than B. The Panel house was insulated by group A for ten days. They insulated the same block of flats together for 6 days. How many days would group B block insulate?