Socík
On the construction site of a new housing estate in Kladno-Kročehlavy, students from the state labor reserve carried out machine plastering of the masonry. 5 students plastered 10 square meters more masonry than 6 plasterers who plastered by hand. Together, they plastered 960 square meters of masonry. What was the average performance of one worker with each method of plastering?
Final Answer:

Tips for related online calculators
Do you have a system of equations and are looking for calculator system of linear equations?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebraplanimetricsUnits of physical quantitiesthemes, topicsGrade of the word problem
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Excavation machine distribution
Excavation work was carried out by nine double-performance machines, which excavated 420 meters of excavation in one day. How many were there if the more powerful machine excavated 420 meters in a week (7 days) and the less powerful engine excavated 280 m - Apartment Building Rooms
There are three sizes of apartments in the new building on the housing estate. One-sixth of the total number of apartments are four-room apartments, and one-third of the rest are two-room apartments. There are 160 three-room apartments. How many four-room - Plastering plan
The mason was to plaster 24.2 m² of the wall in 12 shifts. At what percentage did he meet the plan when plastering 306 m² of walls? - Sidewalk worker
Workers are building a new sidewalk while revitalizing the housing estate. Six workers will do the work in 12 days, but this is a problem because the sidewalk must be completed in 10 days to complete the work on time. How many workers must be hired to com - Square root by hand
Estimate √38 to the nearest hundredths, using any of the two methods (divide and average method or square root estimate formula). - Mason shift sickness
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick. a) In how many more shifts did the masons complete the said plastering? b) In how many shifts was the assigned - Six workers
Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do seven workers earn in 10 days with the same daily average salary?
