Six workers
Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do 7 workers earn in 10 days with the same daily average salary?
Correct result:
Correct result:

Showing 0 comments:
Tips to related online calculators
Check out our ratio calculator.
Do you want to convert time units like minutes to seconds?
Most natural application of trigonometry and trigonometric functions is a calculation of the triangles. Common and less common calculations of different types of triangles offers our triangle calculator. Word trigonometry comes from Greek and literally means triangle calculation.
Do you want to convert time units like minutes to seconds?
Most natural application of trigonometry and trigonometric functions is a calculation of the triangles. Common and less common calculations of different types of triangles offers our triangle calculator. Word trigonometry comes from Greek and literally means triangle calculation.
You need to know the following knowledge to solve this word math problem:
Next similar math problems:
- Painters
Ten painters paint the school in 20 days. How many days do four painters paint the school at the same pace of work?
- Painting rooms
If Dano paint three hours daily given work he complete in 7.5 days. How many hours a day would have to work to finish the job 1.5 days earlier?
- Working time
At 10 hours work shift, work is done in 16 days. How many days will the work be done at 8 hours shifts?
- Five pumps
The water tank is filled with two pumps in 48 minutes. How long would it take to fill it with 5 same pumps?
- Everyone drinks the same
24 bricklayers drink 72 beverage bottles a day at the construction site. How many bottles would 19 bricklayers need? Everyone drinks the same.
- Five combers
Five combers harvest 12 rows of strawberries in 4 hours. How many rows of strawberries will two combers harvest in 10 hours?
- The orchard
4 temporary workers harvested the orchard in 9 days. How many temporary workers we need for six days?
- Three workers
Three workers got paid for work. First earn € 50, the second € 100 and third € 60. For further work should receive together € 735. How do you divide that amount in order to be distributed in the same proportion as the first job?
- Diggers
The excavation was carried out in 4 days and 5 workers worked on it for 7 hours a day. Determine how long it would take to excavate if 7 workers worked on it 8 hours a day.
- Cook on gas
The gas cylinder will last for 30 weekends for 2 hours of daily cooking. How many days will we be able to cook on a new cylinder when we cook 3 hours a day?
- Weighted harmonic average
Ten workers will do some work in 2 minutes, five workers in 10 minutes and three workers in 6 minutes. How many minutes per average worker per worker?
- Hectares of forest
12 workers plant 24 ha of forest in 6 days. In how many days will 15 people and 12 people plant the same area?
- A lot of hay
Martin's grandfather weighed a lot of hay and calculated that for 15 rabbits it last in 100 days. How many days will this lot be enough for 25 rabbits?
- Four workers
Four workers lay the gym floor in six hours. After an hour of working together, one of the workers went to the doctor. How long will it take for the remaining three workers to complete their work?
- Painting school
Redecoration school had scheduled for four crew to 10 days. After two days a single worker ill. For how many days the school was painted when remain workers working with the same tempo?
- Electric energy
There are 875 identical light bulbs in the sports hall lighting for 2 hours. How long does the same amount of electricity consume 100 such bulbs?
- Twelve
Twelve students work on a week forestry brigade. One hundred spruces will receive x CZK, one hundred pine y CZK. How many receive each one students did in one day if they planted a total of 25,000 spruces per week and 30,000 pine trees? Express by express