They exceeded
Mines A and B were supposed to extract 20,000 tonnes of coal together. However, they exceeded their joint plan and extracted 133 tonnes more in total. Mine A exceeded its plan by 2 percent, while mine B extracted 1 percent less than its plan. How many tonnes was each mine supposed to extract according to the original plan, and how many tonnes did each actually extract?
Final Answer:

Tips for related online calculators
Our percentage calculator will help you quickly and easily solve a variety of common percentage-related problems.
Do you have a system of equations and are looking for calculator system of linear equations?
Do you have a system of equations and are looking for calculator system of linear equations?
You need to know the following knowledge to solve this word math problem:
algebrabasic operations and conceptsUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Coal mine
The monthly plan of 17,000 tons of coal exceeded the mine by 1/25. How many tonnes of coal have been harvested from the mine above plan? - Coal mined
The monthly plan exceeded 17,000 tons of coal at the mine by 12.5%. How many tons of coal did they mine? - Egg Delivery Plan Variance
The poultry farm supplied 50,000 eggs per year. According to the plan, it was supposed to deliver 20% of the annual task in April and 16% in May. In April, it exceeded the monthly plan by 830 eggs; in May, it failed to deliver 260 eggs against the plan. W - Two workshops
Two workshops were supposed to produce 4,000 sets of kitchen utensils together. After completing the task, it was found that the first workshop produced 534 sets more than originally planned for it, while the second workshop fulfilled its plan at 80%. How - Budget plan
In the construction of the building, the planned budget exceeded 13%, which was 32,500 euros. How many euros did it cost to build the building? - Workshop production
Five hundred ninety pieces of clothing were to be sewn in the two branches of the tailor's workshop. However, 30% more were sewn in the first workshop and 10% more in the second. They sewed a total of 703 pieces. How many products were initially supposed - Production plan
The annual production plan was exceeded by 2%. If production were higher by 300 products, the plan would be exceeded by 5%. What was the annual production plan?
