Initially 35123
Five hundred ninety pieces of clothing were to be sewn in the two branches of the tailor's workshop. However, 30% more were sewn in the first workshop and 10% more in the second. They sewed a total of 703 pieces. How many products were initially supposed to be sewn by the first branch?
Correct answer:
Tips for related online calculators
Our percentage calculator will help you quickly calculate various typical tasks with percentages.
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
You need to know the following knowledge to solve this word math problem:
Grade of the word problem:
Related math problems and questions:
- Tailor's 40591
The tailor's salon bought 130 meters of fabric for € 1,037. The meter of the first fabric costs € 8.90, and the meter of the second fabric costs € 7.40. Thus, they bought 130 meters of fabric for € 1,037. - Buttons
The men's shirt has sewn nine buttons, and the blouse has three buttons. Together they sewed 60 pieces and consumed 390 buttons. How many shirts? - Tailor's 27111
They bought fabric to sew a skirt in a tailor's salon. If they sewed a length of 50 cm, they would sew 70 of them. How many skirts will they sew if they are 70 cm long? - Two shops
In two different shops, the same skis had the same price. In the first, however, they first became more expensive by 20% and then cheaper by 5%. In the second, they were first cheaper by 5% and then more expensive by 30%, so after these adjustments in the
- Calculate 67814
Two workers work in a workshop to produce the same product. The first worker worked 184 hours per month and produced 656 pieces of the product. The second worker worked 177 hours per month and produced 830 pieces of products. Calculate the hourly output o - Workshops
The plant has three workshops. In the first workshop, produce five products/hour. In the second 8 products/hour, and in the third, seven products/hour. In the first workshop, they produced 240 products. In the second 400 and the third 350 products. Find t - Efficient 43461
Four workers were supposed to build 200m of the fence in 15 days. However, after 3 days, two more workers came to their aid. All workers were equally efficient. Calculate how many meters of the fence (from the original 200m) remained after the first 3 day - Tailor master
There are less than 50m of textile in the tailoring workshop. No textile is left when cutting on a blouse (consumption 1.5m). No textile is left when using a cloth (consumption of 3.2m). How many meters of textiles are in a tailor's workshop? - Forty-eight 19513
25% of children did not attend the course because they were ill. Forty-eight children passed the course. How many children were initially supposed to complete the course?
- Pilgrimage 36951
On the Matějska Pilgrimage, they had 40 prizes of two kinds in the wheel of fortune with a total value of 500 CZK. Four pieces of the first were worth CZK 60, and seven pieces of the second kind were worth CZK 80. Determine the number of pieces of each ty - Produced 3213
Workers produced 12,500 pieces of parts in three days. On the second day, they produced 200 pieces less than on the third day, and on the first day, 350 pieces more than on the 2nd day. How many do they make each day? - Sales of products
For 80 pieces of two quality products, the total sales are 175 Eur. Suppose the first quality product was sold for n EUR per piece (n natural number) and the second quality product after 2 EUR per piece. How many pieces of the first quality were sold? - Construction 2449
The construction material was taken away by three different large cars. The weight of the load on the second was 20% more than on the first. The weight on the third was 20% more than on the second. They loaded a total of 18.2 tons. How many tons were on e - Original plan
Gardeners planted 16% more currant bushes than initially planned. In total, they planted x = 435 shrubs. What was the original plan?
- Production 24021
The plant has to complete the order in 40 working days. Production takes place in two workshops. In the first one, there are more workers; therefore, they would complete the order themselves in 70 working days. In the second workshop, they would complete - Profits
Two members will make a profit of 52 000 EUR. The first earned 8% more and the second 10% more and thus earned together 56 700 EUR. How many will each initially earn? - Production 6266
They produced a total of 7,290 light bulbs in three workshops. How much did each workshop produce when we write their production in the ratio of 2:3:4