Budget plan
In the construction of the building, the planned budget exceeded 13%, which was 32,500 euros. How many euros did it cost to build the building?
Correct answer:
Tips for related online calculators
Our percentage calculator will help you quickly calculate various typical tasks with percentages.
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Grade of the word problem:
Related math problems and questions:
- Chocolate
Chocolate, which initially cost 1.5 euros, was increased by 40%. How many euros did it cost? - Construction 55441
By improving the work process, constructing a family house saved CZK 111,600, which was 5% of the total budget. What was the original budget for a family house? - Farm
Agricultural cooperative (farm) produced 14144 liters of milk for 16 days, which exceeded the plan by 1984 liters. How many liters of milk had a day planned to produce? - Construction 4130
By improving the work process, constructing a family house saved CZK 111,600, which was 9% of the total budget. What was the original budget for a family house? - Ordering 4452
Mr. Milan bought a new bicycle. The Milan he chose was out of stock, so he had to order it. When ordering, he paid a deposit of 110 euros, which is 40% of the total price. How many euros did Mr. Milan's bike cost? - Highway repair
The highway repair was planned for 15 days. However, it was reduced by 30%. How many days did the repair of the highway last? - One-twentieth 82239
Peter and Honzo decided to build the building as quickly as possible. They built one-twentieth of the building in ten minutes. After 20 minutes, three more friends joined. Everyone was building at the same pace. How many minutes did it take to build the s - Deadline
Five equally skilled masons built half the wall in 14 days. They must build the remaining part in 6 days to catch the planned deadline. How many more masons need to be allocated for construction? - Construction 81294
The first group of construction workers would build a certain section of highway in 15 weeks, and the second group would make it in 10 weeks. After four weeks of working together, the second group was dismissed, and only the first group continued to work. - Discounted 63084
The product was discounted by 15% and the price after the discount is 300 euros. How much did it cost before the deal? - RBA
Regional Building Authority has an annual budget of EUR 1806814. In the previous calendar year, has processed 804 approval procedures. How much does an average one-building approval cost (e.g., unsuccessful revoke)? - Expenses 2582
The family pays 250 euros a month for food, which is 33% of the total budget. How much money do they have left for other expenses? - Assembling 63964
Little Pavel was assembling building blocks (a cube is shaped like a cube). He wanted to build a big cube. However, he had 75 dice left, so he increased the edge by one die. Then he was missing 16 dice. How many cubes did he have in the kit? - Skis
Skis, which cost € 800, became 25% more expensive before the season. After the season, they became cheaper again by 25%. How many euros did the skis cost after the discount? - Section 6538
The tourist section planted 145 trees in the spring, which is 15% more than planned. How many trees did they plan to grow? - Expensive 65184
Barborka chose a backpack for school that was three times more expensive than a slipper pocket. If the backpack were 30 euros cheaper, it would cost the same as a slipper pocket. How many euros did a backpack cost? - Discounted 12041
The jacket initially cost 80 euros. Then it was discounted twice, always to 80% of the previous price. How much does it cost after the second discount?