Harmonic mean - practice problems - page 8 of 11
Number of problems found: 203
- Mow the lawn
Dano would mow the lawn in 12 hours and Milada in 16 hours. How long will it take the lawn mow together? - Pond
Workers will empty a pond with two open floodgates in 20 days. A larger floodgate will empty the whole pond in 30 days. For how long would he be emptied with a smaller floodgate? - Pumping
The tank is filled with a larger pump in 12 hours and with a second pump in 15 hours. For how long does the tank fill when both pumps are switched on at the same time? - Sequence 11
What is the nth term of this sequence 1, 1/2, 1/3, 1/4, 1/5 ...? - Oil tank and pipes
Two oil pipelines can fill the underground oil tank. The first is filled in 72 hours, and the second in 48 hours. How many hours from when the first pipeline began to fill the oil is necessary to start filling it with the second to fill in 1 and 1/2 days? - Two pumps filling
A pool with one pump fills in 14 hours and the other in 15 hours. How long will the pool fill when both pumps are used? - Product quality
We have three series of products. We select one product for quality control. Determine the probability of finding a low-quality product if the first batch contains 2/3, the second batch 7/9, and the third batch 3/4 quality products. - Two rooms
If a woman cleans the room in 30 minutes and a man in 90 minutes, how long will it take them to clean two rooms? - Walking distance
The tourist traveled 78 km in three hours. For part of the journey, he traveled by bus at an average speed of 30 km/h, and for the rest, he walked at an average speed of 6 km/h. How long did he walk, and how many kilometers did he walk? - Field sowing
One tractor would sow the field in 3 hours and the other in 7 hours. How long before the fields grow together? - Average speed
The first third of the track was driven by a car at a speed of 15 km/h, the second third at a speed of 30 km/h, and the last third at a speed of 90 km/h. Find the average speed of the car. - Work completion
The worker completes the work in 12 days, the second in 10 days. The first worker kicks himself for four days, then the second worker comes. How long will it take to dig? - Work together
Michal and Dorota would do the work together in 2.25 hours. If Dorota had to do it herself, it would have taken her 6 hours longer than Michal. Determine when Dorota will do the work herself and when Michal will do it himself. - Total
In one class, 1 student collected an average of 20 kg of paper, in the second class 30 kg, and in the third class 40 kg. How many kilograms of paper did 1 student collect on average for all three classes together, when the second class had the same number - Work time
Josef would do the work himself in 5 hours. Josef and Michal would do the work together in 3.5 hours. Determine how long it would take Michal to do the job independently. - Work time
Michal would cut the fence himself in 12 hours. It would take Michal and Juraj 8 hours together. Determine how long it would take for Juraj to do the job. - Work time
Milos would do the work himself in 5 hours. How much would it take Dan to do the job together in two hours? - Cleaners
Milan would clean up the room for 2.5 hours, and Eric would take 10 hours. How long do they sweep the room together? - Harmonic and arithmetic means
The local Utah Department of Child Service office wants to project staffing needs based on current social worker assignments. They have the number of cases per social worker for the following staff: Mary: 25 John: 35 Ted: 15 Lisa: 45 Anna: 20 Calculate: a - Painting time
One painter would paint the school in 15 days. Together with the second painter, they painted the school in 6 days. In how many days the second painter would have painted the school himself?