Themes, topics - math word problems - page 147 of 167
Number of problems found: 3340
- Entrepreneurs  2857  
 Three entrepreneurs decided to invest in a joint project in a ratio of 4:5:7. The largest deposit was € 3,430. How many euros did they invest together? - Millimeters  2851  
 On a 1:10,000 scale map, two cities are 8.5 cm apart. What distance in millimeters will these cities have on a 1:25,000 scale map? - Two-fifths  2845  
 David goes to school by bike and says: "If I go 300 meters further than two-fifths of the way to school, I have just walked one kilometer of the way." How far is David from home to school? - Iron cast 
 What is the weight of cast iron with a volume of 3575 cubic centimeters? The density of the cast iron is 7600 kg/m3 - Original route 
 A walker who had covered 2/3 of the planned hiking route discovered that he had lost his map. He came back for her. After overcoming 1/4 of the route he had already traveled, he found the map. He then continued in his original direction. When he had walke - Three-fifths  2823  
 The student worked 27 hours, fulfilling three-fifths of his commitment. How many more hours should he work to fulfill his promise? How many hours should he work to meet his 120% commitment? - Conservationists 2820 
 A group of nature conservationists (a total of 28 members) and a sports team (16 members) worked for 7 days to clean up the forest park with an area of 10 ha. How many days would conservationists have to work without the help of athletes? - Gardeners  2818  
 Five equally skilled gardeners mowed one-third of the park in 12 hours. How many gardeners need to be called to mow the rest of the park in 8 hours? - Rectangular  2815  
 Calculate the actual proportions of the rectangular plot in meters, which has dimensions of 70 mm and 90 mm, on a 1:2000 scale plan. - Enough  2809  
 Five horses will eat oat stocks in 15 days. For how many days is the supply for three horses enough? - Construction  2798  
 The truck driver drives bricks for construction. If he went three times a day, he would produce the bricks needed for construction in 12 days. How many times a day does he have to go to finish work three days earlier? - Trapezoid  2792  
 Draw a trapezoid with arms 4 cm and 7 cm long and with bases 3 cm and 5 cm long - Ring 
 The gold and copper alloy rings weigh 14.5 g and have a volume of 1.03 cm³. How much gold and copper does each ring contain? The metal densities are Au 19.3 g/cm³ and Cu 8.94 kg·dm-3 - Freezer 
 The freezer has the shape of a cuboid with internal dimensions of 12 cm, 10 cm, and 30 cm. A layer of ice 23 mm thick was formed on the freezer's inner walls (and on the opening). How many liters of water will drain if we dispose of the freezer? - Wood cuboid 
 What is the weight of the wood cuboid 15 cm, 20 cm, and 3 m if 1 m³ wood weighs 800 kg? - Workers 
 Four workers plan to work on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take the remaining three workers to finish the job? - By dosing 
 A dairy uses a new and an old line to dose yogurts. By dosing yogurts on the old line, the order is fulfilled in 6 hours. If both lines work together, they will fulfill the same order in 2 hours. How many hours will it take to fulfill such an order if the - Cube-shaped  2751  
 What weight will a cube-shaped concrete base with an edge length of 10 m have if one concrete cube weighs 2200 kilograms? - Consumption  2729  
 The car's average consumption is x = @ x liters of gasoline per 100 kilometers. How much petrol does a car use on a 320-kilometer road? - Tractors 
 Six tractors plowed the field for eight days. After two days, two tractors broke down. How many days were prolonged work in the field? 
Do you have unsolved math question and you need help? Ask a question, and we will try to solve it. We solve math question. 
 