- Safe codes
Mr. O. came up with two codes for the vault, which he alternates after a week. Both codes have the product of the digit 120. In an even week, it uses the smallest possible number as the code with this property. In the odd week, the largest. No number 1 in - Three children
Three children eat 8 chocolates in 6 days. How many chocolates do 6 children eat in 18 days? - Work time
Josef would do the work himself in 5 hours. Josef and Michael would do the work together in 3.5 hours. Determine how long it would take Michael to do the job independently. - Work time
Michael would cut the fence himself in 12 hours. It would take Michael and George 8 hours together. Determine how long it would take for George to do the job. - Mean
The mean of 50 items for a student's food is 38.6. When checking the work, he found that he had taken one item as 50 to read as 40 correctly in these circumstances. What should the correct arithmetic mean? - Work time
Milos would do the work himself in 5 hours. How much would it take Dan to do the job together in two hours? - Painting rooms
If Daniel paints for three hours daily, he completes it in 7.5 days. How many hours a day would he have to work to finish the job 1.5 days earlier? - Grass
Peter and Stanley mow the lawn together in 3 hours 12 minutes. How long would it take Peter alone if Stanley can mow the lawn by himself in 384 minutes? - Cleaners
Miles would clean the room in 2.5 hours, and Eric would take 10 hours. How long would it take them to clean the room together? - The creek
Workers cleaned the creek within three days. On the first day, cleanse one-fifth of the creek's length; the next day, 40% of the stream's length; and on the third day, 8 km length of the creek. How long is a creek? - Factory
In the factory, workers work in three shifts. Half of all employees work on the first shift, a third on the second shift, and on the third shift 200 employees. How many employees work at the factory? - Blueberries 2
Helen and Martin collected eight liters of blueberries in two hours. How long will Helen take to collect the blueberries alone if we know that she takes 2.5 hours less than Martin? - Contract
Eight employees complete the contract for 65 hours. After 17 hours, three employees had to leave for another job. How many more hours will it take to complete the contract? - Shaft drainage time
The mine foreman calculated that 2 pumps must be in operation for 17.5 hours to drain the shaft. He wanted to speed up the emptying of the shaft and added 3 more identical pumps. How long will it take to empty the shaft? Please also show your calculation. - Pumps
Four identical pumps fill the tank in 40 hours. How many pumps would we have to use if we wanted to save 8 hours? - Master work
The master will complete the given task in 4 hours. When they're done together, how long will it take to master students entirely in three hours? - Switzerland - summerjob
Susan and Hannah used to work in a cherry orchard to earn money for a sightseeing trip to Switzerland. They picked 15 trees every day and harvested the entire orchard in 10 days. How long would it take them to harvest the entire orchard if they picked 20 - Hall
A rectangular hall is to be paved with square tiles with a side length of 15 cm. The hall has a length of 18 meters and a width of 3 m. How many tiles do you need to buy if 2 percent of the amount are damaged during the work? - Painting time
One painter would paint the school in 15 days. Together with the second painter, they painted the school in 6 days. In how many days the second painter would have painted the school himself? - Workers needed
Twenty-seven workers did the work in 12 days. In how many days would nine workers do the same job?