Nine workers dig a 120-meter-long canal in eight hours. How long would it take five workers to dig a 200-meter-long canal?
Final Answer:

Tips for related online calculators
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebrabasic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Two Workers Digging Canal
The first worker digs a canal in 3 hours. The other will dig the trench in 4 hours. They will work 1 hour opposite each other and then together. How long will it take them? - Workers 2
The worker dug the trench for 7 hours, and another worker for 10 hours. They recruited to work even one worker. Digging should be done for 2 hours. For how long would dig the third worker alone? - Two workers
Two workers work together and perform the job in 12 hours. If one has done half the work and then the second worker does the next half of the work, it will take 25 hours. How long would it take to job them separately? - Apple worker combing
Two temporary workers comb apples from 15 apple trees in 5 hours and 20 minutes. After two hours, three other temporary workers came to help them. How long did it take to comb apples from these 15 trees? - Worker job hours
Five workers do a job in 20 hours. How long will it take two workers to do the same job? - Digging
The first worker would dig a trench in 6 hours. For the second, the same work would take 4 hours. How long did it take for the trench to be dug if they worked together? - Ditch
The excavator dug 40% of the excavation in 2 hours and 20 minutes. How long does it take him to dig the whole ditch?