Digging

The first worker would dig a trench in 6 hours. For the second, the same work would take 4 hours. How long did it take for the trench to be dug if they worked together?

Correct answer:

t =  2.4 h

Step-by-step explanation:


t•(1/6+1/4)=1

5t = 12

t = 12/5 = 2.4