Picture frames
Destiny has to make 24 picture frames. Each frame uses 16 3/8 wood trim. she completed 2/3 on the first day. How many inches of wood trim is needed to complete the remaining frames on the second day?
Correct answer:

Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Need help with mixed numbers? Try our mixed-number calculator.
Do you want to convert length units?
Need help with mixed numbers? Try our mixed-number calculator.
Do you want to convert length units?
You need to know the following knowledge to solve this word math problem:
planimetricsnumbersUnits of physical quantitiesGrade of the word problem
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- FRAMES
Joe is making picture frames out of wood. The length of each frame is 10 inches, and the width is 8 inches. Each piece of wood used to make the frames is 8 feet long. How many pieces of wood will he need to make 10 picture frames? Clue: find the perimeter
- Reecha
Reecha has a picture frame that is 13 1/2 inches wide. How many pictures that are 3 3/8 inches wide can be placed beside each other within the frame?
- Frames
A framer is to prepare 23 picture frames. The frame will have dimensions of 30 cm and 42 cm. The strips from which he will make the frames are 3 meters long. a) How many frames will he make from one strip? b) How many strips will he need?
- Piece of wood
I have a 6-foot-long piece of wood that I want to cut to build picture frames. If each piece is going to be ¾ foot long, how many pieces will I be able to cut?
- Aspect ratio
Determine the length ratio to the width of a picture frame that is 12 3/4 inches long and 8 1/2 inches wide.
- Each of
Each of Suzan's notebooks is 4/5 inches wide. How many notebooks will fit if she has 25 inches of space remaining on her bookshelf?
- A contractor 2
A contractor has to complete his contract in 92 days. 234 men were set to do the work, each of them works for 16 hours/day. After 66 days, 4/7 of the work is completed. How many additional men may be employed, so that the work may be completed in time, ea