City plan
The city planned to repair the highway section for 20 hours. Workers reduced this time by 20%. How long did the repair take? (express in hours and minutes)
Result
Result
Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Our percentage calculator will help you quickly calculate various typical tasks with percentages.
Do you want to convert time units like minutes to seconds?
Our percentage calculator will help you quickly calculate various typical tasks with percentages.
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Grade of the word problem:
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Highway repair
The highway repair was planned for 15 days. However, it was reduced by 30%. How many days did the repair of the highway last? - Temporary 67594
Two temporary workers comb apples from 15 apple trees in 5 hours and 20 minutes. After two hours, three other temporary workers came to help them. How long did it take to comb apples from these 15 trees? - Minutes 47973
The workers halved the planned break, so it lasted 42 minutes. How many minutes would it take to extend it by only a quarter? - Six workers
Six workers planned to repair the roof in 5 days. After two days, two workers get sick. How long will the remaining workers complete the roof at the same rate? - Construction 81294
The first group of construction workers would build a certain section of highway in 15 weeks, and the second group would make it in 10 weeks. After four weeks of working together, the second group was dismissed, and only the first group continued to work. - Permitted 80726
The highway section is 25 km long, and the maximum permitted speed is 110 km/h. The driver covered this section in 12 minutes. Did he exceed the speed limit? - The work
The work was to be done by 150 workers. At the beginning of their work, The company reduced their number by 40, which increased the work time by 5 and 1/3 of the schedule. How long did work take? - Coronavirus 17083
The railway company planned the repair of the railway tracks for 15 days. Only some employees showed up for work due to the coronavirus, and they extended the repair to 24 days. By what percentage did the repair time increase? - Repair pipe
Twenty workers had to repair broken pipes in 30 days. After fourteen days, four laborers joined them. How long did the pipe repair work last? - Required 3504
The milling machine makes the part in 20 minutes. On a better machine, it can make 30 parts in 6 hours. By how much percent will the time required to produce one part on a new machine be reduced? - Road repair
Road repair took 10 days for 36 workers if they worked 9 hours a day. How many days take repair the same road 37 workers if they work 8 per day? - The cyclist - avg speed
The cyclist make a distance of 25 km at an average speed of 20 km/h. How long did the trip take him (in hours and minutes)? - Passenger 64534
A passenger car drove a highway section at a constant speed. At a speed of 20 km/h higher, the ride would take 6 minutes less. At a speed of 20 km/h lower, it would take 9 minutes more. Calculate the length of the highway section. - Train delay
Due to a breakdown, the train lost 16 minutes standing on the track behind Brno. He "eliminated" this delay so that after the start, the 80 km long section went at a speed 10 km/h higher than originally planned. What speed was it, and what was it supposed - Consumption 2918
When driving in the city, the car has an average consumption of k liters of gasoline per 100 km, but when driving on the highway, it consumes an average of 20% liters less. Express the consumption of a car if it travels 25 km in the city and 75 km on the - Ditch
The excavator dug 40% of the excavation in 2 hours and 20 minutes. How long does it take him to dig the whole ditch? - Workers 82802
Five workers do a job in 20 hours. How long will it take two workers to do the same job?