Work break extension
The workers halved the planned break, so it lasted 42 minutes. How many minutes would it take to extend it by only a quarter?
Final Answer:

Tips for related online calculators
Need help calculating a sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebranumbersUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- City plan
The city planned to repair the highway section for 20 hours. Workers reduced this time by 20%. How long did the repair take? (express in hours and minutes) - Chocolate
Children break chocolate first to third and then every part of another half. What kind got each child? Draw a picture. What part would have been received if each piece had halved? - Table - tablecloth
Mrs. Vránová has a square table with a side length of 110 centimeters. She wants to have a square tablecloth sewn on it so that its corners extend beyond the edges of the table by 25 centimeters. What dimensions should the tablecloth have? - Song durations
In the last 20 minutes, six songs were played. Two were the same length, 2 minutes each, 49 s. The next two were 52 seconds longer than the previous one. The penultimate song lasted only 180 s. How long was the last song? The last song lasted. It could ha - Performance time
The theatrical performance began at 7:30 PM and lasted two-quarters of an hour with one 20-minute break. What time did the show end? - Working group
20 men complete one-third of a piece of work in 20 days. How many more men should be employed to finish the rest of the work in 25 more days? - Train delay
Due to a breakdown, the train spent 16 minutes standing on the track behind Brno. He "eliminated" this delay, so after the start, the 80 km-long section went at a speed 10 km/h higher than originally planned. What speed was it, and what was it supposed to
