Construction 27743
The length of the gutter is 2 m, and the diameter of the gutter is 0.4 m. It is necessary to add 7% of the material to the joints. Find the consumption of sheet metal for the gutter construction.
Correct answer:

Tips for related online calculators
Our percentage calculator will help you quickly and easily solve a variety of common percentage-related problems.
Do you want to convert area units?
Do you want to convert length units?
Do you want to convert area units?
Do you want to convert length units?
You need to know the following knowledge to solve this word math problem:
solid geometrybasic operations and conceptsUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Sheet metal troughs
A farmer orders sheet metal troughs from a tinsmith for loading calves on pasture. The tinsmith looks at a picture of the trough and estimates how much sheet metal he will need for one trough. Determine the sheet metal consumption, add 15% for waste and j
- Gutter
How much metal is needed to produce 60 pieces of gutter pipes with the diameter 17 cm and length of 6 m? The plate bends add 6% of the material.
- Metal sheets
How much metal sheet is needed to produce eight 4 m long and 12 cm in diameter gutters? During production, joints are calculated at 3% of total consumption.
- The observatory
The dome of the hemisphere-shaped observatory is 5.4 meters high. How many square meters of sheet metal need to be covered to cover it, and must we add 15 percent to the minimum amount due to joints and waste?
- Gutter pipe
How many m² of sheet metal is required to produce a 12 m long and 18 cm wide gutter if a 7% bend is required?
- Hectoliters - tank
A cylindrical tank with a base diameter of 1.2 m is supposed to hold 17 hectoliters of water. How many square meters of sheet metal are needed to make it? We calculate if 2% of the surfaces are for joints and waste.
- Roof cover
Above the pavilion with a square ground plan with a side length of a = 12 m is a pyramid-shaped roof with a height v = 4.5 m. Calculate how much m² of sheet metal is needed to cover this roof; if 5.5% of the sheet, we must add for joints and waste.