Timber log

The ship goes from point x to y. Downstream it takes 4 hours, upstream 6 hours. How long does it take from a point x to y a log?

Correct result:

x =  24 h

Solution:

 s=4 (v+p) s=6 (vp) v=10  4ps+4v=0 6p+s6v=0 v=10  p=2 s=48  x=s/p=48/2=24 h



We would be pleased if you find an error in the word problem, spelling mistakes, or inaccuracies and send it to us. Thank you!






Showing 0 comments:
avatar




Tips to related online calculators
Looking for calculator of harmonic mean?
Looking for a statistical calculator?
Do you want to convert velocity (speed) units?
Do you want to convert time units like minutes to seconds?

Next similar math problems:

  • Two pumps
    pumps_4 Pump A takes twice as long to fill a tank than B . Together they take 2 hours to fill the tank. How long does each one take to fill the tank by itself?
  • Water current speed.
    river_4 Two cities along the river are 100 km apart. The powerboat downstream runs for 4 hours, upstream for 10 hours. Determines the river's current speed.
  • The ship
    ship_1 The ship went upstream speed of 20 km/h in relation to water. River flows at speed 10 km/h. After half an hour, he stopped and returned downstream to the starting point. How long it took way back when even if downstream speed of ship is 20 km/h in relatio
  • Summer tires
    workers_44 Three tire servants have to change the summer tires on 6 cars in 2 hours. Mark's replacement would take 4.5 hours, Jirka would do it in 3 hours and 10 minutes, and Honza in 4 hours. Will they be able to replace all tires at the desired time?
  • Steamship
    parnik Between the two ports on the river is going steamship. The journey there and back takes 8:42. Downstream steamship traveling at 20 km/h, upstream 9 km/h. What is the distance between the ports?
  • Blueberries
    boruvky Marie earns 3 liters of blueberries for 3.4 hours, Peter 2.4 liters for 2.9 hours. How long have earns together one liter?
  • Car
    american-cars The car goes from point A to point B at speed 86 km/h and back 53 km/h. If it goes there and back at speed 67 km/h trip would take 10 minutes shorter. What is the distance between points A and B?
  • Digging
    digging The first worker would dig a trench in 6 hours. For the second, the same work would take 4 hours. How long did it take for the trench to be dug if they worked together?
  • Two pumps
    nadrz_4 The first pump fills the tank in 24 hours second pump in another 40 hours. For how long will it take to fill the tank if it operates both pumps at the same time?
  • Pedestrian up-down hill
    peak Pedestrian goes for a walk first at the plane at 4 km/h, then uphill 3 km/h. Then it is in the middle of the route, turns back, and goes downhill at speed 6 km/h. The total walk was 6 hours. How many kilometers went pedestrian?
  • Machines
    machinery In the workshop are three machines. The first is treated 250 parts for 4.7 hours, the second is treated 300 parts for 1.9 hours and the third is treated 230 parts for 4.6 hours. How long will take to make 3100 parts if worked all three machines at the sam
  • Cleaners
    clean Milan would clean up the room for 2.5 hours, Eric would take 10 hours. How long they swept the room together?
  • Together 3
    painter_8 If Sally can paint a house in 4 hours, and John can paint the same house in 6 hours, how long will it take for both of them to paint the house together?
  • A report
    work_4 Maricris can type a committee report in 5 hours. Jane helped Maricris and together they finished the report in 3 hours. How long would it take Jane to complete the report she had worked alone?
  • Painters
    painter First painter painted fence himself for 4 hours, the second painter 1.2 hours sooner than first, and the third painters slowest up to 16 hours. How long took them paint fence if worked together?
  • Minute average
    workers_40 In a factory, four workers are assigned to complete an order received for dispatching 1400 boxes of a particular commodity. Worker A takes 4 mins per box, Worker B takes 6 minutes per box, C takes 10 mins per box, D takes 15 mins per box. Find the average
  • Four pavers
    tiles2_4 Four pavers would pave the square in 18 days. How many pavers do you need to add to done work in 12 days?