Washing cars
Frank takes 3 and 1/4 hours to wash six cars. How long will it take to wash 12 cars, 18 cars, and 24 cars?
Final Answer:

Tips for related online calculators
Need help calculating a sum, simplifying, or multiplying fractions? Try our fraction calculator.
Need help with mixed numbers? Try our mixed number calculator.
Do you want to convert time units like minutes to seconds?
Need help with mixed numbers? Try our mixed number calculator.
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
arithmeticnumbersUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Car wash help
Four guys would finish washing cars at a gas station in 4 hours. After one hour, two more friends come to help them. How long will it take to finish the car wash? - Washing elephants
An experienced tamer will wash an elephant in 40 minutes. It takes a temporary worker 2 hours. How long in a minute will a tamer and a temporary worker wash three elephants together? - Two friends
Michael and Teresa have the same 9 km long journey home from SNP Square. It takes Michael an average of 2/5 hours by tram, and Teresa rides a bicycle at an average 18 km/h speed. Guess who comes home early and how much? - Workers
A Group of workers washed half of the windows of the building in two hours. How long will it take half the workers to wash all the windows of the building? - Madams
During spring cleaning, ladies were going to wash the windows. Mother takes 2 hours to wash all the windows, the grandmother takes 2 times longer, and Paula washes all the windows in 2 hours. How many hours will you spend washing the windows of this "wome - There 3
There are six bays at an oil change shop. It takes 45 minutes to work on a car at each bay. Cars are coming every 6 minutes to the shop for an oil change. How long before cars start backing up? What kind of spacing is needed to maintain proper flow? - Construction of the road
Six trucks are supposed to be transported for 18 days to construct the road dam. After three days, the transport company sent two more cars to the construction site. How long will it take to carry the material?
