Workers

Group of workers washing half of the windows of the building in two hours. How long will take half the workers wash all the windows of the building?

Correct result:

t =  8 h

Solution:

t=2 2 2=8 h



We would be pleased if you find an error in the word problem, spelling mistakes, or inaccuracies and send it to us. Thank you!






Showing 0 comments:
avatar




Tips to related online calculators
Do you want to convert time units like minutes to seconds?

You need to know the following knowledge to solve this word math problem:

Next similar math problems:

  • Digging
    digging The first worker would dig a trench in 6 hours. For the second, the same work would take 4 hours. How long did it take for the trench to be dug if they worked together?
  • Six workers
    workers Six workers planned to repair the roof in 5 days. After two days, two workers get sick. How long will the remaining workers complete the roof at the same rate of work?
  • Eight hours
    clocks_15 Brigadier Franta ties a sheaf of hay in 20 minutes. Lujza in the same time only a quarter. How many sheaves will they tie together in 8 hours?
  • Repair pipe
    workers_39 20 workers had to repair broken pipes in 30 days. After fourteen days, four laborers joined them. How long did the pipe repair work last?
  • Trucks
    truck_big Truck take you the some amount of clay in 30 hours. Second truck in 40 hours. Trucks carted the clay away some time together then the second truck broke down and the first one completed the job in five hours. What time worked together?
  • Suzan
    eliska My daughter reaches X years in X squared, said Suzan father in 2009 during the celebration of her birthday. When will given fact become reality and how many years at that time will have Suzan?
  • Bricklayers
    murar The first bricklayer would build a wall in 3 days, the second in 4 days. The first bricklayer worked alone for a day, then the second bricklayer came to his aid and they finished the work together. How long did it take to build the wall?
  • Bricklayers
    delnik_4 When a bricklayer works himself to redeem the house in 8 days, the other bricklayer will be finished in 10 days. How long will it take to make 3 such houses together?
  • 5 pumps
    pump Five pump to pump 3 hours 1600 hl of water. How long pumped same amount of water 4 pumps?
  • Five pupils
    lavicka_1 Five pupils clean 30 chairs one hour before four pupils. How many chairs clean one pupil in 1 hour?
  • The field
    tractors 3 tractors plow the field in 6 hours. However, after 2 hours, 1 tractor broke down. How long will the field be plowed?
  • 40% volume
    workers_41 40% volume with 104 uph (units per labor hour) 8 people working. What is the volume?
  • Mr and Mrs
    clocks2_8 Mr. Calda and Mrs. Cald have a total of 139 years. How many years have when we know that Mr. Calda is 9 years older than Mrs. Cald
  • Family
    family_14 Mom is 42 years old and her daughters 13 and 19. After how many years will mother as old as her daughter together?
  • Digging companies
    companies Company A would dig a pit for 12 days, company B for 15 days, company C for 20 days and the company D for 24 days. Work began together companies C and D, but after three days joined them other two companies. How long took to dig a pit?
  • Four painters
    painter The company sent four painters to paint the school. They should be done in 12 days. After three days, one painter got ill. How long will the remaining painters paint the school?
  • Hectoliters of water
    pumps_7 The pool has a total of 126 hectoliters of water. The first pump draws 2.1 liters of water per second. A second pump pumps 3.5 liters of water per second. How long will it take both pumps to drain four-fifths of the water at the same time?