Workers 82802
Five workers do a job in 20 hours. How long will it take two workers to do the same job?
Correct answer:
Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Two workers
Two workers work together and perform the job in 12 hours. If one has done half the work and then the second worker next half of the work, it will take 25 hours. How long would it take to job them separately? - Together 7332
One tractor driver would mow the field in 15 hours. Another tractor driver would do the same job in 12 hours. How long will it take them to do the work together if the latter starts plowing two hours later than the former? - Workers
Four workers plan to work on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take the remaining three workers to finish the job? - Workers 54253
Four workers packed the goods with the same output in 6 hours. In how many hours would five workers do the same job? Express it in hours and minutes.
- Together 39671
Three workers were to lay the parquet floor. If everyone worked alone, the first would finish the job in 30 hours, the second in 24 hours, and the third in 20 hours. How long will they do the floor if they work together? - Planting 27201
In the forest, there are 84 workers employed in planting saplings. Working 10 hours a day, they would finish the job in 24 days. After 7 days, 14 workers leave. How long will it take the others to finish planting the saplings if they work 12 hours a day f - Jerrie
Jerrie can repair her car in 1 1/12 hours. A mechanic can do the same job in 8/12 hours. How much longer does it take Jerrie to do the job? - Complete 5584
The two workers dug together for 6 hours. The first worker would do the work himself in 14 hours. How long would it take for the second worker to complete the task? - Independently 3874
Josef would do the work himself in 5 hours. Josef and Michal would do the work together in 3.5 hours. Determine how long it would take Michal to do the job independently.
- 10 workers
Ten workers will perform the assigned work in 8 days. How long will it take to get the job done if six workers work for six days, and then another six join them? - Workers
A Group of workers washed half of the windows of the building in two hours. How long will it take half the workers to wash all the windows of the building? - Complete 2833
The tiler covered 3/5 of the wall with tiles in two hours and 45 minutes. How long did it take to complete the entire lining area at the same power? How long did the whole job take him? - Together 82970
The first tiler would tile the pool inside in 5 working hours; the second would need 7 working hours for the same job. How long would it take them to tile the pool inside together if the second tiler starts working on the pool 12 minutes later than the fi - Together 3781
Milos would do the work himself in 5 hours. How much would it take Dan to do the job together in two hours?
- Temporary 67594
Two temporary workers comb apples from 15 apple trees in 5 hours and 20 minutes. After two hours, three other temporary workers came to help them. How long did it take to comb apples from these 15 trees? - Determine 3851
Michal would cut the fence himself in 12 hours. It would take Michal and Juraj 8 hours together. Determine how long it would take for Juraj to do the job. - Completed 60913
The daughter needs 12 hours to clean up after the painters. The mother could do the same cleaning in 8 hours. How long will it take to clean up after the painters if the mother starts work only after the daughter has completed 2 hours?