Working time
If work is done in 16 days at a 10-hour shift, how many days will it be done at 8-hour shifts?
Final Answer:

Tips for related online calculators
You need to know the following knowledge to solve this word math problem:
basic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Pavel Vojta trees
Paul and Victor were planting trees at a forestry work camp. Paul planted two more trees than Victor in each six-hour shift. Together, they planted 156 saplings in three shifts. How many saplings did each of them plant? - Factory
In the factory, workers work in three shifts. Half of all employees work on the first shift, a third on the second shift, and on the third shift 200 employees. How many employees work at the factory? - Workshop
The workshop has to be produced for 5 days 2000 components. How many components must be produced in the workshop daily, and how much per hour if the shift is 8 hours? - 10 workers
Ten workers will perform the assigned work in 8 days. If six workers work for six days and then another six join them, how long will it take to get the job done? - Two 2
Two different harvesters together harvested potatoes from an area of 6.6 ha in one shift. The area that the less powerful harvester could harvest in six shifts, the more powerful one could harvest in five shifts. Determine the area that each harvester cou - Three painters
The three painters have painted bridges. The first would work done in 5 days, the second in 6 days, and the third in 7.5 days. How long will the bridge work if they work together? - Factory order completion
Factory A can fulfill the order independently in 10 days. Factory B fulfills the same order in 16 days. How many days will the order be completed if only plant B works on it for 3 days and then both plants together?