Strawberries

Three people pick strawberries from 48 rows in 8 hours. How many hours do five people need to pick strawberries from 20 rows?

Correct answer:

t =  2 h

Step-by-step explanation:

o=48/(3 8)=2  t=20/(5 o)=20/(5 2)=2 h



Did you find an error or inaccuracy? Feel free to write us. Thank you!



avatar







Tips to related online calculators
Do you want to convert time units like minutes to seconds?

Related math problems and questions:

  • Five combers
    permutations Five combers harvest 12 rows of strawberries in 4 hours. How many rows of strawberries will two combers harvest in 10 hours?
  • Pumps
    cerpadla Four identical pumps fill the tank in 40 hours. How many pumps would we have to use if we wanted to save 8 hours?
  • Working time
    work At 10 hours work shift, work is done in 16 days. How many days will the work be done at 8 hours shifts?
  • Diggers
    digging Eight diggers will do the job in 85 hours. After 21 hours, 3 diggers had to leave. How many hours will the work be done?
  • Painters
    time Ten painters paint the school in 20 days. How many days do four painters paint the school at the same pace of work?
  • Part-timers
    jahoda Six part-timers would take seven hours to pick strawberries. How long would this work take if two more temporary workers were added after three hours?
  • In the bakery
    chlieb In 2.25 hours, 24 pieces of bread are baked in the bakery. How many breads are baked in the bakery in 6 hours and 45 minutes?
  • Seven workers
    wood Seven workers clear the glade in 22 hours. How many workers would need to be done in 8 hours?
  • The bricklayer
    murar The bricklayer built a six-meter base of the fence in 3 hours. How long does it take to build a 14 m long base?
  • 4 pipes
    roury The tank flows out by 4 pipes in 6 hours 120 hl water. How much water flows out of 5 pipes of the same diameter in 14 hours?
  • Five pumps
    nadrz The water tank is filled with two pumps in 48 minutes. How long would it take to fill it with 5 same pumps?
  • The work
    clock-night-schr The work was to be done by 150 workers. At the beginning of their work, their number reduced by 40, which increased the time of work by 5 and 1/3 of the schedule. How long did work take?
  • Hectares of forest
    stromy 12 workers plant 24 ha of forest in 6 days. In how many days will 15 people and 12 people plant the same area?
  • Cable car
    lanovka The cable car will carry 1280 passengers in 40 minutes. How many people will be transported in 2.5 hours?
  • Wall builders
    bricks If 12 men can build a wall 398 metres long in 48 days, how long would it take 33 men to build a wall 347 metres long? Answer to 3 decimal places.
  • Painting rooms
    palma If Dano paints three hours daily, he complete in 7.5 days. How many hours a day would have to work to finish the job 1.5 days earlier?
  • Pumps
    pumps After the floods, four equally powerful pumps exhausted water from the flooded cellar in 6 hours. How many hours would take a drained out with three equally powerful pumps?