Together
If eight men, ten women, and 16 children collect ₹1024 in 4 days, how many days will be required for six men, five women, and four boys to collect ₹768? (₹ is Indian Rupee)
Final Answer:

Tips for related online calculators
Do you solve Diofant problems and are looking for a calculator of Diofant integer equations?
You need to know the following knowledge to solve this word math problem:
algebrabasic operations and conceptsnumbersthemes, topicsGrade of the word problem
Related math problems and questions:
- MDZ - theater
There are 798 men, women, and children in the theater. The number of men is twice the number of women. The number of women is twice the number of children. How many men, women, and children were there? - Society people distribution
There are men, women, and children in society. There are 3 times more men than women and 5 more children than women. If 6 more men and 6 women came, men would be half the company. How many women, men, and children are there? - Hockey audience
In the hockey audience between Sweden and Finland, there are 126 men, 65 boys, 46 children from Sweden, 50 children from Finland, and 200 Swedes, of which half are men and 39 women from Finland. How many people are in the audience? - A residential
A residential colony has a population of 5400, and 60 liters of water is required per person per day. The effective utilization of rainwater constructed a water reservoir measuring 48m × 27m × 25m to collect the rainwater. For how many days is the water i - A contractor 2
A contractor has to complete his contract in 92 days. 234 men were set to do the work, each of them works for 16 hours/day. After 66 days, 4/7 of the work is completed. How many additional men may be employed, so that the work may be completed in time, ea - Children in Theater
The theater is watched by 3900 spectators, 3200 of whom are women and 700 men, the rest being children. Thus, 3900 children watch the theater. - Common work
39 men can repair a road in 12 days working 5 hours a day. How many days will be required to complete the work by 30 men working 6 hours a day?
