Harvested 81719
Eight hop pickers harvest in 24 days. How many more pickers must be hired if the hops need to be harvested in 16 days?
Correct answer:

Tips for related online calculators
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Workers 3291
The broad workers will do the job in 22.5 days. How many workers still need to be hired to do the job seven days earlier?
- Switzerland 3584
Zuzka and Hanka used to work in a cherry orchard to earn money for a sightseeing trip to Switzerland. They brushed 15 trees every day and harvested the entire orchard in 10 days. How long would it take them to harvest the entire orchard if they brushed 20
- Revitalization 39191
Workers are building a new sidewalk while revitalizing the housing estate. Six workers will do the work in 12 days, but this is a problem because the sidewalk must be completed in 10 days to complete the work on time. How many workers must be hired to com
- Deadline
Five equally skilled masons built half the wall in 14 days. They must build the remaining part in 6 days to catch the planned deadline. How many more masons need to be allocated for construction?
- You must
You must level a rooftop unit with shims on the curb. If you need to shim the unit 13/16" on one side, how many shims will be required if it is given 1/8" and 1/16" shims? Use ten shims exactly.
- Painters 44121
Two painters will paint the bridge in 12 days. How many painters must we employ if we need to paint the bridge in 8 days?
- Cooperative 19973
The cooperative farmers harvested 300 tons of grain. Wheat was 25% more than oats, and rye was 96 tons less than wheat and oats combined. How many tons of wheat, rye, and oats did the cooperative harvest?