Municipal 81852
Six workers repair 48 meters of municipal road in 2 days. How many days will 3 workers with the same output repair 60 meters of the road?
Correct answer:

Tips for related online calculators
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Road repair
Road repair took 10 days for 36 workers if they worked 9 hours a day. How many days take repair the same road 37 workers if they work 8 per day?
- Six workers
Six workers planned to repair the roof in 5 days. After two days, two workers get sick. How long will the remaining workers complete the roof at the same rate of work?
- Workers 4168
Ten workers manage to repair the road in 22 days. After four days, two more workers joined to speed up the work. How many days does it take to repair the road?
- Road repairs
A 16 1/2 kilometer stretch of road needs repairs. Workers can repair 2 1/4 kilometers of road per week. How many weeks will it take to repair this stretch of road?
- Workers 54253
Four workers packed the goods with the same output in 6 hours. In how many hours would five workers do the same job? Express it in hours and minutes.
- Worker's performance
Fifteen workers paint 180 m fence in 3 days. In how many days will nine workers paint a 360 m fence? We assume that each worker has the same, constant and unchangeable performance.
- Temporary 1637
Three temporary workers will clean 60 meters of the sidewalk in 5 hours. How many meters of sidewalk will clean by seven temporary workers in 8 hours?
- Hectares of forest
Twelve workers plant 24 ha of forest in 6 days. How many days will 15 people and 12 people plant in the same area?
- Calculate 67814
Two workers work in a workshop to produce the same product. The first worker worked 184 hours per month and produced 656 pieces of the product. The second worker worked 177 hours per month and produced 830 pieces of products. Calculate the hourly output o
- Repair pipe
Twenty workers had to repair broken pipes in 30 days. After fourteen days, four laborers joined them. How long did the pipe repair work last?
- Shoemaker
Both the shoemaker and his apprentice repaired his shoes. The apprentice worked for six days and repaired ten pairs of shoes daily. The shoemaker did the same job for four days. How many pairs of shoes did the shoemaker repair per day?
- Swimming 7602
At the swimming pool, they use three pumps with the same output to fill the pool and fill the pool in 6 hours. How long does it take for the pool to fill nine pumps?
- Assistant 39951
The worker performs the repair work in 20 days, and his assistant does the job himself in 60 days. How many days would they work together?
- Panel house
The construction company has two groups of workers. Group A has more members than B. Panel house was insulated by group A for ten days. They insulated the same block of flats together in 6 days. How many days would group B block insulate?
- Insulation
Two workers insulate the house for five days. After the first day of working together, only one worker continue to cover the house. How many days will the house be insulated if every worker has the same work tempo?
- Z-score
The mean adult male pulse rate is 67.3 beats per minute, with a standard deviation of 10.3. Find the z-score for an adult male's pulse rate of 75. (Round the z-score to two decimal places. )
- Workers
Ten workers must pave road street for 22 working days. After four days were for speeding up work, added two more workers. a) After how many work days now workers complete the paved road? b) How many working days does a total paved road take?