Jewellery-maker

A jewellery-maker threads 5 beads in 20 seconds. A necklace consists of 210 beads, 30 are already threaded.
a) Write an equation of the dependence of the number of threaded beads on time (in minutes), during which the jewellery-maker will be threading the beads.
b) In what time will the jewellery-maker finish the entire necklace?
c) In what time will the jewellery-maker thread 30 necklaces if she would not have a single bead threaded?
Write as an equation and express the time in hours.

Final Answer:

f = 15t
t1 =  12 min
t3 =  7 h

Step-by-step explanation:

f=205 60 t  r=205 60=205 60=20300=15  f= r t f=15t
t1=r21030=1521030=12 min
n=30 t2=r210 n=15210 30=420 min t3=t2 h=t2:60  h=420:60  h=7 h=7 h



Help us improve! If you spot a mistake, please let let us know. Thank you!







Tips for related online calculators
Need help calculating a sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you want to convert time units like minutes to seconds?

You need to know the following knowledge to solve this word math problem:

basic operations and conceptsnumbersUnits of physical quantitiesGrade of the word problem

Related math problems and questions: