Themes, topics - math word problems - page 152 of 167
Number of problems found: 3338
- two spacecraft
Recently, two spacecraft successfully landed on two small planets labeled α and β. Both ships were equipped with sensitive sensors that measured the basic parameters of the asteroids. The sensors found that the day α took six times longer on planet α than
- Internal angles
The ABCD is an isosceles trapezoid, which holds: |AB| = 2 |BC| = 2 |CD| = 2 |DA|: On the BC side is a K point such that |BK| = 2 |KC|, on its side CD is the point L such that |CL| = 2 |LD|, and on its side DA, the point M is such that | DM | = 2 |MA|. Det
- Two workers
Two workers work together and perform the job in 12 hours. If one has done half the work and then the second worker does the next half of the work, it will take 25 hours. How long would it take to job them separately?
- Pumps 5
Five pumps pumped in 3 hours 1800 hl of water. How many hectoliters of water were pumped by four equally powerful pumps in 6 hours?
- Work at plant
The handyman vowed to do repair work at the plant for 25 days. However, work had to be shortened, so he sought help. Together, they made all the corrections for 13 1/3 days. How long would the work take the helper himself?
- Hexagons
There is a square ABCD, a square EFGD, and a rectangle HIJD, points JG lie on the side CD, while DJ is less than DG, and points HE lie on the side DA, while DH is less than DE. We also know that DJ is equal to GC. Hexagon ABCGFE has a perimeter of 96 cm,
- Soup
On Monday, we cooked 25 pots and ten boilers of soup. On Tuesday, we cooked 15 pots and 13 boilers. On Wednesday, we cooked 20 pots, and on Thursday, we cooked 30 boilers. The same amount of soup was cooked on Monday and Tuesday. How many times is more so
- Repairman
The repairman has vowed to do repair work at the plant for 25 days. However, work had to be shortened, so he took a helper worker. Together, they made all the corrections for the whole day. How long would it take work to help workers?
- Two masons
Two masons built the garage together—it took 18 days. If they worked independently, the other would have worked 15 days more than the first. How many days would it take each mason to build the garage alone?
- Probability - tickets
What is the probability when you have 25 tickets in 5000 that you do not win the first (one) prize?
- Bricklayers
Eight bricklayers build a house for 630 days. How many bricklayers must be added after 150 days to complete the building in (next) 320 days?
- MO - triangles
On the AB and AC sides of the ABC triangle lies successive points E and F, and on segment EF lie point D. The EF and BC lines are parallel. It is true this ratio FD:DE = AE:EB = 2:1. The area of the ABC triangle is 27 hectares, and line segments EF, AD, a
- Painters 4
One painter will do the job for 12 days. After a 4 1/3 day, he comes second to help him complete work together for eight days. How long would work the second painter himself?
- Hiker and cyclist
At 7 PM hiker started at 6 km/h to hike. After three hrs. later started on the same trip cyclist at a speed of 15 km/h. After an hour of driving a flat tire and takes him half hour to correct the defect. At what time catch up cyclist with the hiker?
- Keyboards keys
Michael had small keys on the shelf, which you can see in the picture. Their tones were marked on the white keys. Little Clara found the keys. As she took them off the shelf, they fell out of her hand, and all the white keys spilled out. So that the broth
- Katy MO
Kate drew a triangle ABC. The middle of the line segment AB is marked as X, and the center of the side AC is marked as Y. On the side BC, she wants to find point Z so that the area of a 4gon AXZY is the greatest. What part of the ABC triangle can maximall
- Air pressure
The meteorological station measured the air pressure of 1060 hPa (hectopascals). In addition to measuring instruments, there is a residential house with a flat roof with dimensions of 10 m and 28 m. What pressure force in MN (meganewtons) from the air on
- Aluminum wire
Aluminum wire of 3 mm diameter has a total weight of 1909 kg and a density of 2700 kg/m³. How long is the wire bundle?
- Cuboid 5
Calculate the mass of the cuboid with dimensions of 12 cm, 0.8 dm, and 100 mm made from spruce wood (density ρ = 550 kg/m³).
- Day Number
The day number is the serial number of the day in the relevant month (i.e., the number on 5 August 2016 is 5). The digit sum of the day is the sum of the values of all digits on the date of that day (i.e., the digit sum on 5 August 2016 is 5 + 8 + 2 + 0
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.