Searching word math problems
Discover the latest math problems and word problems designed to deepen your understanding of mathematics. Solutions are explained simply and clearly so that everyone can follow along. Regular practice is the best way to succeed at school and in entrance exams. New problems are added every day — come back and practice more.Number of problems found: 19685
- Seller 3
A seller wanted to sell 100 cheaper and 50 more expensive mobile phones. The price difference between a cheaper and a more expensive mobile is 30 euros. Originally he wanted to sell each cheaper one at a 20% discount and each more expensive one at a 12% d - Class boy girl
If 3 boys were added to the eighth grade, 50% of the class would be boys. If, on the other hand, 3 girls were added, they would make up 7/12 classes. How many children are there in the class? - Grain flour grinding
We get 80 percent flour by grinding grain. How much grain do we need to grind to get 400 kg of flour? - Aquarium tube filling
Water flows into an aquarium with dimensions of 14x26x3 m through a tube with a diameter of 5 cm at a speed of 2 m/s. How long does it take for the aquarium to fill with water? - Filip Monika meeting
Philip traveled 15 km from Monica's house to his grandmother's village. Monika can visit him. They meet at the point where the bikes arrive. They both left the house at 9:00. At what time did they meet when Philip was walking at a speed of 19 km/h and Mon - Circus sector seats
In a circus, in one sector for spectators, the seats are arranged in such a way that in each higher row, there is one more seat than in the previous one. How many seats are there in a sector with 22 rows if there are 8 seats in the first row? - Product price reduction
If I reduce the price of the product by 40%, this price will be 60% lower than if I increased the price of this product by 720 euros. What was the original price of the product? - Paver square shifts
Seven pavers would pave the square in 15 shifts. After five shifts, two pavers fell ill. How long will it take for the remaining pavers to finish the job? - Circular segment
A circular segment has an area of 6.04 cm², the central omega angle is 15 degrees, what is the radius? - Triangle perimeter area
What are the sides of a right-angled triangle with a perimeter of 45 centimeters and a volume of 67.5 cm²? - Brazil flag diamond
The flag of Brazil has a yellow diamond on a green field with a blue circle inside. If we had a flag with dimensions of 70 cm x 50 cm, the rhombus would have a side 35 cm long and a height of 30 cm. Indicate with fractions in basic form what part of the f - Block cover fabric
The teacher decided to sew covers for the eight-seat blocks in the school library. All cubes are cube-shaped with an edge 40 cm long. How many m² of fabric will the teacher need in total if the blocks are not lined from the bottom, and 5% must be added fo - Circle boy members
There are 12 girls in the circle. Girls make up 2/3 of all members. How many boys are there in the circle? - Truck sand transport
It should have taken four trucks 6 hours and 45 minutes to bring the sand to the construction site. After 90 minutes, one car broke down. How long did it take to transport the remaining sand in three trucks? - Four 12
Four classmates (Ivan, Matej, Fero, Ľuboš), who go to school by the same tram connection, agreed that they would meet in the morning at the stop in front of the school. As they promised, so it happened. The first classmate arrived at the stop in front of - Lamp cone shell
The lamp shade should be formed by the shell of a cone with a base diameter of 48 cm and a side of 32 cm. Calculate how much material will be needed to make it, assuming 8% waste - Amazon river length
The longest Brazilian river, the Amazon, is ten times longer than the two Czech rivers, Vltava and Berounka. The ratio of the lengths of the Vltava and Berounka is 9:5. At the same time, the length ratio of the Vltava and Morava rivers is 5:4. How many ki - Sailor food supply
Food for 56 sailors would last 32 days. How long did the food supplies last the expedition if 14 castaways were taken on board after 12 days of sailing? - Logger field clearing
Fifteen loggers would take 12 days to clear a large field. How many days did this work require, if 5 more woodcutters were transferred to them after 4 days of work? - Mason house addition
8 masons build a house in 630 days. How many masons must we add after 150 days to complete the whole house in 320 days?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.
