Painting

Jožko with Fero painted the bench for four hours. How many hours would take work if four friends help him?

Result

x = 1:20 h Wrong answer

Solution:


4*2 = (2+4)*x

6x = 8

x = 43 ≈ 1.333333

Calculated by our simple equation calculator.








Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




To solve this example are needed these knowledge from mathematics:

Do you have a linear equation or system of equations and looking for its solution? Or do you have quadratic equation?

Next similar examples:

  1. Sprayers
    postrekovac The vineyard can be sprayed first sprayer in 5 hours and with the second in 8 hours. How long would it take if we use sprayers both at once?
  2. Cakes
    cookies_2 Grandmother baked cakes. Half of its was poppy, quarter with plum jam and 16 cheesecakes. How many cakes she baked in total?
  3. Find x
    eq222_23 Solve: if 2(x-1)=14, then x= (solve an equation with one unknown)
  4. How old
    boy_3 The student who asked how many years he answered: "After 10 years I will be twice as old than as I was four years ago. How old is student?
  5. Novak
    novakovci Novak needed to dig up three of the same pit in the garden. The first pit dug father alone for 15 hours. His second dig son helped him and it did that in six hours. The third pit dug son himself. How long it took him?
  6. Quiz
    quiz Tested student answered correctly on a 4/ 8 questions. Wrong answers was 16. How many questions answered?
  7. Aunt
    teta Annie aunt is 35 years old, Annie is 14 years. For how many years will aunt have twice as many years as Annie?
  8. Forest nursery
    stromcek_2 In the forest nursery after winter, they found that 1/10 stems died out of them. For them, they land 193 new spruces. How many spruces are in the forest nursery?
  9. Working together on project
    work_10 Two employees working on the project. First make it alone for 20 days the second for 24 days. How many days will take to complete project if 5 days they work together then first will take two days holiday and after returning they completes a project toget
  10. Norm
    rajcata Three workers planted 3555 seedlings of tomatoes in one dey. First worked at the standard norm, the second planted 120 seedlings more and the third 135 seedlings more than the first worker. How many seedlings were standard norm?
  11. Highway
    truck_3 Six trucks will be used to build the roadside 18 days. After 3 days, two more trucks were sent to build. How long will it take for material move?
  12. Equation
    rovnice_3 Solve the equation: 1/2-2/8 = 1/10; Write the result as a decimal number.
  13. Dropped sheets
    books_26 Three consecutive sheets dropped from the book. The sum of the numbers on the pages of the dropped sheets is 273. What number has the last page of the dropped sheets?
  14. Unknown number
    nums Identify unknown number which 1/5 is 40 greater than one tenth of that number.
  15. Equation
    serwisy_chemia_01 ?
  16. Pumps A and B
    pump_2 Pump A fill the tank for 12 minutes, pump B for 24 minutes. How long will take to fill the tank if he is only three minutes works A and then both pumps A and B?
  17. One-third
    krtek A one-third of unknown number is equal to five times as great as the difference of the same unknown number and number 28. Determine the unknown number.