Working together on project

Two employees working on the project. First make it alone for 20 days the second for 24 days. How many days will take to complete project if 5 days they work together then first will take two days holiday and after returning they completes a project together?

Result

t =  12 d

Solution:


(t-2)/20+t/24 = 1

11t = 132

t = 12

Calculated by our simple equation calculator.








Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




To solve this example are needed these knowledge from mathematics:

Do you have a linear equation or system of equations and looking for its solution? Or do you have quadratic equation?

Next similar examples:

  1. Workers
    workers Two workers fulfill a certain task when working together for 5 days, the first if he worked himself done work in 13 days. How many days will do whole job a second worker?
  2. Working together
    malovka_1 One painter paint the nursery in 10 days, the second in 8 days. How many days will the nursery be painted if they work together?
  3. Two looms
    stav On two different looms with different performance can be make required quantity of textile in 6 hours when both work together. On the first machine this quantity of the textile can make in 10 hours. How long should take make same quantity of textile on a s
  4. Painters
    3_painters One painter could paint a school for 7 days. The second one for 6 days. It was necessary to paint the school in two days. Next painter was invited and all worked together. How long would this painter painted the school itself?
  5. Collection
    maliny_1 John has collected half a bucket of raspberries in 45 minutes, Eva collects the whole bucket in an hour. How many minutes it would take to fill a bucket if the two children work together?
  6. Novak
    novakovci Novak needed to dig up three of the same pit in the garden. The first pit dug father alone for 15 hours. His second dig son helped him and it did that in six hours. The third pit dug son himself. How long it took him?
  7. Sprayers
    postrekovac The vineyard can be sprayed first sprayer in 5 hours and with the second in 8 hours. How long would it take if we use sprayers both at once?
  8. Pool
    inlet Pool is filled with two water supply. The first supply fill pool for nine hours, the second for six hours. How many hours will take fill the pool when the water flows in through the first supply 3 hours and then we will open a second supply?
  9. Pumps A and B
    pump_2 Pump A fill the tank for 12 minutes, pump B for 24 minutes. How long will take to fill the tank if he is only three minutes works A and then both pumps A and B?
  10. Dwarfs
    trpaslik Four dwarfs would prepare firewood for Snow White in580 minutes. After an hour and a half they recruit friends so that finished preparing the wood for 280 minutes. How many dwarfs they recruited?
  11. Workers
    workers_34 Two workers will construct the stage at the festival in 54 hours. Organizers need to shorten the assembly time by 42 hours. How many workers must the assembly company send?
  12. 12 Moons
    12_mesicku Good Marry came to ask twelve moons for help with collecting strawberries. All twelve moons 1200 strawberries picked in 20 minutes. But lazy months July and August cease tear after 5 minutes. How many minutes in total will take collect strawberries?
  13. Strawberries
    strawberries Father collects strawberries himself in 4 hours, son in 14 hours. How long will it take them along when dad comes to help son collect strawberries after 3 hours?
  14. Unknown number
    nums Identify unknown number which 1/5 is 40 greater than one tenth of that number.
  15. Six years
    children_9 In six years Jan will be twice as old as he was six years ago. How old is he?
  16. Equation
    rovnice_3 Solve the equation: 1/2-2/8 = 1/10; Write the result as a decimal number.
  17. Simple equation
    axes_1 Solve for x: 3(x + 2) = x - 18