Work at plant
The handyman vowed to do repair work at the plant for 25 days. However, work had to be shortened, so he sought help. Together, they made all the corrections for 13 1/3 days. How long would the work take the helper himself?
Final Answer:

Tips for related online calculators
Need help with mixed numbers? Try our mixed number calculator.
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebrabasic operations and conceptsnumbersUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Repairman
A repairman promised to complete repair work at the plant in 25 days. However, the work had to be shortened, so he took on a helper. Together, they finished all the repairs in a full day. How long would the helper take to do the work alone? - Courier delivery cars
The courier company delivers the ordered goods through the e-shop. If the delivery were made by 2 cars, it would be completed in 6 hours. However, after 4 hours, the first car's driver stopped delivering, and the second car continued to deliver for anothe - Repair pipe
Twenty workers had to repair broken pipes in 30 days. After fourteen days, four laborers joined them. How long did the pipe repair work last? - Painters 4
One painter can do a job in 12 days. After 4 1/3 days, a second painter comes to help, and together they complete the work in 8 days. How long would the second painter take to do the job alone? - Task completion
Milos had to do 20 clicks. However, he only made 16. What percentage did he miss in completing the task? - Percentage - b/g students
There are 584 students at the school, 421 of them boys. What percentage of students are girls? - Six workers
Six workers planned to repair the roof in 5 days. After two days, two workers get sick. How long will the remaining workers complete the roof at the same rate?