Worker trench time
Worker A will dig a trench in 12 days. Worker B will dig a trench in 18 days. How many days will it take them together?
Final Answer:

Tips for related online calculators
Looking for calculator of harmonic mean?
Looking for a statistical calculator?
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Looking for a statistical calculator?
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
statisticsalgebraUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Digging
The first worker would dig a trench in 6 hours. For the second, the same work would take 4 hours. How long did it take for the trench to be dug if they worked together? - Two Workers Digging Canal
The first worker digs a canal in 3 hours. The other will dig the trench in 4 hours. They will work 1 hour opposite each other and then together. How long will it take them? - Workers 2
The worker dug the trench for 7 hours, and another worker for 10 hours. They recruited to work even one worker. Digging should be done for 2 hours. For how long would dig the third worker alone? - Work completion
The worker completes the work in 12 days, the second in 10 days. The first worker kicks himself for four days, then the second worker comes. How long will it take to dig? - Digger ditch together
An older digger would dig a ditch by himself in 6 hours. A younger digger can handle the same trench in 3 hours. How long would it take them to dig if they worked together? - Soldier
An experienced soldier digs a good trench in 30 hours. Two soldiers dug the same trench every 40 hours. How many hours will the ditch dig all three together? - Trench
The trench is a four-sided prism. The cross-section has a trapezoidal shape with basements of 4m and 6m, and the length of the trench is 30m. What is the depth of the trench if we dig 60,000 l of soil?
