Mathematics:
Word math problems
Worksheets
Calculators
Two pumps
The first pump fills the tank in 24 hours second pump in another 40 hours. How long will it take to fill the tank if it operates both pumps simultaneously?
Correct answer:
x =
0
h
Step-by-step explanation:
Equation is non-linear.
Calculation:
Equation is linear and have one solution:
8x-120=0
x=15
Our simple
equation calculator
calculates it.
Try another example
Did you find an error or inaccuracy? Feel free to
write us
. Thank you!
Text - write and change what you want:
The first pump fills the tank in 24 hours second pump in another 40 hours. How long will it take to fill the tank if it operates both pumps simultaneously?
Your e-mail:
Thank you for submitting an example text correction or rephasing. We will review the example in a short time and work on the publish it.
Tips for related online calculators
Looking for calculator of
harmonic mean
?
Looking for a
statistical calculator
?
Do you have a linear equation or system of equations and looking for its
solution
? Or do you have
a quadratic equation
?
Do you want to
convert time units
like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
statistics
harmonic mean
algebra
equation
Units of physical quantities:
time
Themes, topics:
work
Grade of the word problem:
practice for 12 year olds
practice for 13 year olds
practice for 14 year olds
Related math problems and questions:
Families 83209
Coal for 15 families lasts 60 days. How many days will the coal last for 20 families?
An electrician 6
An electrician can wire 4 1/2 rooms in 3 hours. How long does it take him to wire each room?
Painting a room
If 1 person can paint a room in 6 hrs, how many hours will 3 people finish painting the room?
Working together
Zeru can complete a certain job in 5 days, and Tulu can complete the same job in 3 days. How long will they complete the job if they work together?
Tadeo
Tadeo volunteered at the library 6 times as many hours over the weekend as Dylan. Together, they volunteered a total of 14 hours. How many hours did each person volunteer over the weekend? Write a system of equations that represents the situation. Let x r
3 men
Three men painting a house take 7 1/2 days. How long will 5 men take over the same job? Working at the same rate.
Peter 13
Peter and Paul finished the first round of orders in 3 hours and 15 minutes. Peter, however, works a lot faster than Paul does; Peter is 2 and a half times as fast as Paul. For the second day of shipping orders, peter is unavailable; paul will have to do
A stock
A stock of food is enough to feed 50 people for 14 days. How many days will the food last if 20 more people are added?
Wayne
Wayne can clear a plot of land in 1/3 hours, and Melvin can clear the same plot of land in 2/4 hours. What could possibly be the time for both Wayne and Melvin if they combine to clear the same plot of land?
Two painters
Two painters are assigned to finish painting the houses in a housing project. John can finish a house in 4 days. Kurt painted it in 3 days. How long would it have taken if John and Kurt worked painting the house together?
7 men
Seven men can complete work in 52 days. How many days will 13 men finish the same work?
Building a wall
If 12 men can build a wall 398 meters long in 48 days, how long would it take 33 men to build a wall 347 meters long? Answer to 3 decimal places.
Swimming pool 6
We open the first pipe, and then after two hours, we open the second pipe without closing the first. The swimming pool will be filled with both pipes in 4 hours. If we open the first pipe itself, it will fill the pool 1.5 times faster than the second pipe
Calculate 67814
Two workers work in a workshop to produce the same product. The first worker worked 184 hours per month and produced 656 pieces of the product. The second worker worked 177 hours per month and produced 830 pieces of products. Calculate the hourly output o
Pears
Boris, Filip, and Martin harvested pears. It took Boris 30 minutes to harvest one full crate, 20 minutes for Filip, and 36 minutes for Martin. Calculate how long it would take them to pick up five full crates together.
Two companies
The two companies did work together for 100 days. The first company would do it in 150 days. How many days would the work take the second company?
Harvesters
Five combine harvesters harvest wheat in 12 days. How much will the harvest time be shortened when six combine harvesters enter the field?
all math problems
18666
physical quantity
6343
time
2849
equation
785
velocity
718
motion problems
606
work
493
unit conversion
485
length
364
reason
338
fundamentals of Physics
310
system of equations
281
algebra
5513
arithmetic
4190
basic functions
5881
combinatorics
1002
geometry
3056
goniometry and trigonometry
559
numbers
6177
planimetrics
3380
solid geometry
2283
statistics
771
themes, topics
3007
New math problems
Popular math problems
Harder math problems
The easiest word problems
Language
sk
cz
en