The mountain hut
The mountain hut has a supply of food for 8 tourists for 15 days. Half more were come. How long will their food supply last if the daily ration remains the same?
Correct result:
Correct result:

Showing 0 comments:
Tips to related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Next similar math problems:
- Mason with assistant
Mason had to complete the work in 10 days. Two and a half days later his assistant arrived. Together they completed the work in next three and a half days. How many days would he need an assistant for the same work?
- Digging companies
Company A would dig a pit for 12 days, company B for 15 days, company C for 20 days and the company D for 24 days. Work began together companies C and D, but after three days joined them other two companies. How long took to dig a pit?
- Workers
Workers A and B will done work together for 15 days. They worked together 13.5 days. Then A worker became ill and worker B finish the job alone for 7.5 days. If every worker was working alone, how many days took whole work for worker A and B?
- On the farm
On the farm were housed 70 heads of cattle with food supply for 180 days. After 60 days, 10 head of cattle sold, and for the next 30 days they sold 10 more. How many days is sufficient supply of feed for the remaining cattle?
- Workhorses
A team of colleagues done the work in 20 days. After adding 2 colleagues from the beginning the work was completed in 15 days. How many members has the colleague team?
- Painters
The first team of painters would paint bridge in 15 days, the second in 10 days. After 3 days of working together second team goes out and continue only first team. How many days took second team to finish painting the bridge?
- Painters 4
One painter will do the job for 12 days. After a 4 1/3 day he comes second to help him and complete work together for 8 days. How long would work the second painter himself?
- Two masons
Two masons built the garage together - it took 18 days. If they worked independently, the other would work 15 days more than the first. For how many days would build the garage each mason himhelp?
- Lumberjacks
Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if 5 workers added to it after 4 days?
- Wood harvesting
The harvested wood is bundled from the forest to a sawmill. The driver makes the journey four times a day, and the work takes him 8 days. How many times would he have to go daily to get the job done 2 days earlier?
- Drinking water
A man drinks a keg of water in 40 days, and a woman drinks in 62 days. How many days do they consume a keg together?
- Pumps
6 pump fills the tank for 3 and a half days. How long will fill the tank 7 equally powerful pumps?
- Working together
One worker performs work in 3 days, the second in 5 days. How much do they work together?
- Performance
Two masons with the same performance would have made of plaster for 6 days. One of them, however, has increased its daily performance by 50%. How long would take they now to make plaster together?
- Grandma
6 kg of potatoes is enough for four at home for 15 days. For how many days will this amount be enough if a grandma will visit?
- Working time
At 10 hours work shift, work is done in 16 days. How many days will the work be done at 8 hours shifts?
- Repair pipe
20 workers had to repair broken pipes in 30 days. After fourteen days, four laborers joined them. How long did the pipe repair work last?