Construction 71794
Two different trucks together would bring the construction material in 6 hours. However, after 4 hours, the first car was transferred to another job, and the second one was driven for another 6 hours. How many hours would it take for the first car to deliver the material? How many for the second?
Correct answer:

Tips for related online calculators
Looking for calculator of harmonic mean?
Looking for a statistical calculator?
Our percentage calculator will help you quickly and easily solve a variety of common percentage-related problems.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Looking for a statistical calculator?
Our percentage calculator will help you quickly and easily solve a variety of common percentage-related problems.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
statisticsalgebrabasic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Delivering 80805
The courier company delivers the ordered goods through the e-shop. If the delivery were made by 2 cars, it would be completed in 6 hours. However, after 4 hours, the first car's driver stopped delivering, and the second car continued to deliver for anothe
- Construction 82411
It should have taken four trucks 6 hours and 45 minutes to bring the sand to the construction site. After 90 minutes, one car broke down. How long did it take to transport the remaining sand in three trucks?
- Construction 7337
A smaller car would bring 40 times the material needed for construction, and a larger car 30 times. When the first and second cars had made 12 trips, the smaller car was recalled, and the larger one was to bring the remaining material. How many more roads
- Materials 4405
Two trucks were supposed to load the building materials in 10 days. After 6 days of work, the first car broke down, and the second one carried building materials for another 9 days. How many days would the first and second cars take the building materials
- Construction 81294
The first group of construction workers would build a certain section of highway in 15 weeks, and the second group would make it in 10 weeks. After four weeks of working together, the second group was dismissed, and only the first group continued to work.
- Construction of the road
Six trucks are supposed to be transported for 18 days to construct the road dam. After three days, the transport company sent two more cars to the construction site. How long will it take to carry the material?
- Tractors
Two tractors plow the field for 4 hours together. If the first tractor plowed half of the field and then the second tractor completed the job, it would take 9 hours. How many hours does the field plow for each tractor separately?