Construction 71794
Two different trucks together would bring the construction material in 6 hours. However, after 4 hours, the first car was transferred to another job, and the second one was driven for another 6 hours. How many hours would it take for the first car to deliver the material? How many for the second?
Correct answer:
Tips for related online calculators
Looking for calculator of harmonic mean?
Looking for a statistical calculator?
Our percentage calculator will help you quickly calculate various typical tasks with percentages.
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Looking for a statistical calculator?
Our percentage calculator will help you quickly calculate various typical tasks with percentages.
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Delivering 80805
The courier company delivers the ordered goods through the e-shop. If the delivery were made by 2 cars, it would be completed in 6 hours. However, after 4 hours, the first car's driver stopped delivering, and the second car continued to deliver for anothe - Construction 82411
It should have taken four trucks 6 hours and 45 minutes to bring the sand to the construction site. After 90 minutes, one car broke down. How long did it take to transport the remaining sand in three trucks? - Materials 4405
Two trucks were supposed to load the building materials in 10 days. After 6 days of work, the first car broke down, and the second one carried building materials for another 9 days. How many days would the first and second cars take the building materials - Construction 7337
A smaller car would bring 40 times the material needed for construction, and a larger car 30 times. When the first and second cars had made 12 trips, the smaller car was recalled, and the larger one was to bring the remaining material. How many more roads
- Construction 81294
The first group of construction workers would build a certain section of highway in 15 weeks, and the second group would make it in 10 weeks. After four weeks of working together, the second group was dismissed, and only the first group continued to work. - Together 82970
The first tiler would tile the pool inside in 5 working hours; the second would need 7 working hours for the same job. How long would it take them to tile the pool inside together if the second tiler starts working on the pool 12 minutes later than the fi - Construction of road
For the construction of the road dam, it is supposed to transport six trucks for 18 days. After three days, the transport company sent two more cars to the construction site. How long will it take to carry the material? - Tractors
Two tractors plow the field for 4 hours together. If the first tractor plowed half of the field and then the second tractor completed the job, it would take 9 hours. How many hours does the field plow for each tractor separately? - Together 7332
One tractor driver would mow the field in 15 hours. Another tractor driver would do the same job in 12 hours. How long will it take them to do the work together if the latter starts plowing two hours later than the former?
- Two workers
Two workers work together and perform the job in 12 hours. If one has done half the work and then the second worker next half of the work, it will take 25 hours. How long would it take to job them separately? - Digging
The first worker would dig a trench in 6 hours. For the second, the same work would take 4 hours. How long did it take for the trench to be dug if they worked together? - Trucks
The truck takes you some amount of clay in 30 hours. The second truck takes the same amount of clay in 40 hours. Trucks carted the clay away some time together, then the second truck broke down, and the first one completed the job in five hours. What time - Complete 5584
The two workers dug together for 6 hours. The first worker would do the work himself in 14 hours. How long would it take for the second worker to complete the task? - Construction 2449
The construction material was taken away by three different large cars. The weight of the load on the second was 20% more than on the first. The weight on the third was 20% more than on the second. They loaded a total of 18.2 tons. How many tons were on e
- Workers
Four workers plan to work on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take the remaining three workers to finish the job? - Two workers
One worker needs 40 hours to do a job, and the second would do it in 30 hours. They worked together for several hours, then the company recalled the second, and the first completed the job in 5 hours. How many hours did they work together, and how much di - Renovate 7342
The first company would renovate the complex in 30 hours. Another company would fix it in 20 hours. But the first company left after 5 hours of joint work. How long will it take to renovate the site?