Construction 7337
A smaller car would bring 40 times the material needed for construction, and a larger car 30 times. When the first and second cars had made 12 trips, the smaller car was recalled, and the larger one was to bring the remaining material. How many more roads does the bigger car have to cover?
Correct answer:
Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Construction 71794
Two different trucks together would bring the construction material in 6 hours. However, after 4 hours, the first car was transferred to another job, and the second one was driven for another 6 hours. How many hours would it take for the first car to deli - Construction 2449
The construction material was taken away by three different large cars. The weight of the load on the second was 20% more than on the first. The weight on the third was 20% more than on the second. They loaded a total of 18.2 tons. How many tons were on e - Two gears
The two gears fit together. The larger gear has 32 teeth. The smaller gear has 20 teeth fewer. How many times does turn a smaller gear if the bigger gear turns three times? - Transported 23301
The material, which weighed 18.2 tons, was transported by three cars. The second drove 20% more than the first, and the third 20% more than the second. How many tons did one car transport?
- Construction 82411
It should have taken four trucks 6 hours and 45 minutes to bring the sand to the construction site. After 90 minutes, one car broke down. How long did it take to transport the remaining sand in three trucks? - Delivering 80805
The courier company delivers the ordered goods through the e-shop. If the delivery were made by 2 cars, it would be completed in 6 hours. However, after 4 hours, the first car's driver stopped delivering, and the second car continued to deliver for anothe - Researchers
Researchers asked 200 families whether or not they were the homeowner and how many cars they had. Their response was homeowner: 14 no car or one car, two or more cars 86, not homeowner: 38 no car or one car, two or more cars 62. What percent of the famili