Materials 4405
Two trucks were supposed to load the building materials in 10 days. After 6 days of work, the first car broke down, and the second one carried building materials for another 9 days. How many days would the first and second cars take the building materials?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Construction 82411
It should have taken four trucks 6 hours and 45 minutes to bring the sand to the construction site. After 90 minutes, one car broke down. How long did it take to transport the remaining sand in three trucks? - Delivering 80805
The courier company delivers the ordered goods through the e-shop. If the delivery were made by 2 cars, it would be completed in 6 hours. However, after 4 hours, the first car's driver stopped delivering, and the second car continued to deliver for anothe - Construction of road
For the construction of the road dam, it is supposed to transport six trucks for 18 days. After three days, the transport company sent two more cars to the construction site. How long will it take to carry the material? - Construction 71794
Two different trucks together would bring the construction material in 6 hours. However, after 4 hours, the first car was transferred to another job, and the second one was driven for another 6 hours. How many hours would it take for the first car to deli - Tractors
Six tractors plowed the field for eight days. After two days, two tractors broke down. How many days were prolonged work in the field? - A truck 2
A truck leaves the home with building materials and makes a return trip every six days. To deliver all the materials, you need eight truck trips every month. How many trucks do you need? - Trucks
The truck takes you some amount of clay in 30 hours. The second truck takes the same amount of clay in 40 hours. Trucks carted the clay away some time together, then the second truck broke down, and the first one completed the job in five hours. What time - Agricultural 65594
Six identical harvesters were supposed to work on the harvest for 12 days in the agricultural cooperative. After three days, however, two harvesters left for another team. Find how long the harvest time in the farm cooperative has increased. - Beet campaign
The beet field is being harvested. Beets are transported to 3 plants and three trucks. The first car returns to the field three times an hour, the second car after 30 minutes, and the third car five times an hour. All cars left at 8 in the morning. How ma - Weighing 8299
In the second truck, the load was 20% heavier than in the first, and in the third, the load weight was 20% less than in the second. In total, the trucks carried a load weighing 15.8 tons. How much did each cost weigh? - Efficient 43461
Four workers were supposed to build 200m of the fence in 15 days. However, after 3 days, two more workers came to their aid. All workers were equally efficient. Calculate how many meters of the fence (from the original 200m) remained after the first 3 day - Cleaning 27663
During the pool cleaning, two drains and one inlet were opened. The first outflow would empty the pool in 6 hours, the second outflow would fill it in 9 hours, and the inflow would fill it in 12 hours. How long will it take to empty if the drains are open - Assemblers 47483
Two assemblers with the same daily output were to complete the assembly in 12 days. After 4 days, one of them got sick, and the other finished the assembly in another 16 days. How long would it take everyone to do the assembly by themselves? - Friends 81769
Four guys would finish washing cars at a gas station in 4 hours. After one hour, two more friends come to help them. How long will it take to finish the car wash? - Highway
Six trucks will be used to build the roadside for 18 days. After three days, the company sent two more trucks to make. How long will it take for the material to move? - Backpacking 2579
Aleš, Karel, and Simon went on a trip at 6:45. They arrived at the finish line at 9:15. They carried one backpack with them and took turns after 20 minutes. Karel carried the first section, and at 8.30 by Simon. a) Who carried the backpack in the second s - Construction 2449
The construction material was taken away by three different large cars. The weight of the load on the second was 20% more than on the first. The weight on the third was 20% more than on the second. They loaded a total of 18.2 tons. How many tons were on e