A truck 2
A truck leaves home with building materials and makes a return trip every six days. To deliver all the materials, you need eight truck trips every month.
How many trucks do you need?
Correct result:
How many trucks do you need?
Correct result:

Showing 0 comments:
Tips to related online calculators
You need to know the following knowledge to solve this word math problem:
Next similar math problems:
- Painters
Ten painters paint the school in 20 days. How many days do four painters paint the school at the same pace of work?
- Six workers
Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do 7 workers earn in 10 days with the same daily average salary?
- Bricklayers
Seven bricklayers will build the house in 630 days. How many bricklayers do we need to take after 150 days to complete the building for (additional) 336 days?
- Wood harvesting
The harvested wood is bundled from the forest to a sawmill. The driver makes the journey four times a day, and the work takes him 8 days. How many times would he have to go daily to get the job done 2 days earlier?
- Hurry - rush
At an average speed 7 km/h I will come from the school to the bus stop for 30 minutes. How fast I need to go if I need to get to the bus stop in 21 minutes?
- Four pavers
Four pavers would pave the square in 18 days. How many pavers do you need to add to done work in 12 days?
- Seven workers
Seven workers clear the glade in 22 hours. How many workers would need to be done in 8 hours?
- Painting rooms
If Dano paint three hours daily given work he complete in 7.5 days. How many hours a day would have to work to finish the job 1.5 days earlier?
- Painting school
Redecoration school had scheduled for four crew to 10 days. After two days a single worker ill. For how many days the school was painted when remain workers working with the same tempo?
- Machines 2
2 machines for 50 hours produces 2,000 products. How many machines need to buy to make in 30 hours 15,000 products?
- Shoemaker
Both the shoemaker and his apprentice repaired his shoes. The apprentice worked for 6 days and repaired 10 pairs of shoes every day. The shoemaker did the same job in 4 days. How many pairs of shoes did the shoemaker repair per day?
- Highway
Six trucks will be used to build the roadside 18 days. After 3 days, two more trucks were sent to build. How long will it take for material move?
- A lot of hay
Martin's grandfather weighed a lot of hay and calculated that for 15 rabbits it last in 100 days. How many days will this lot be enough for 25 rabbits?
- Hay bags
4 cows eat 16 hay bags in 5 days. How many bags will eat 5 cows in 7 days?
- Five pumps
The water tank is filled with two pumps in 48 minutes. How long would it take to fill it with 5 same pumps?
- Working together
Two people will do the work in 12 days. They worked together for 8 days. Then only one worked for 10 days. How many days would each of them do the work if he worked alone?
- Three workers
Three workers A, B, C have to work on a specific task. Workers A and B completed whole task in 14 days, B together with C for 23 days, A together with C for 13 days. How long it would take to complete the task every one of them alone? How long it would ta