A truck 2

A truck leaves home with building materials and makes a return trip every six days. To deliver all the materials, you need eight truck trips every month.
How many trucks do you need?

Correct answer:

n =  2

Step-by-step explanation:




Did you find an error or inaccuracy? Feel free to write us. Thank you!






avatar




Tips to related online calculators
Do you want to round the number?
Do you want to convert time units like minutes to seconds?

Related math problems and questions:

  • Painters
    time Ten painters paint the school in 20 days. How many days do four painters paint the school at the same pace of work?
  • Bricklayers
    murar Seven bricklayers will build the house in 630 days. How many bricklayers do we need to take after 150 days to complete the building for (additional) 336 days?
  • Six workers
    workers Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do 7 workers earn in 10 days with the same daily average salary?
  • Wood harvesting
    woord The harvested wood is bundled from the forest to a sawmill. The driver makes the journey four times a day, and the work takes him 8 days. How many times would he have to go daily to get the job done 2 days earlier?
  • Hurry - rush
    bus At an average speed 7 km/h, I will come from the school to the bus stop for 30 minutes. How fast I need to go if I need to get to the bus stop in 21 minutes?
  • Four pavers
    tiles2 Four pavers would pave the square in 18 days. How many pavers do you need to add to done work in 12 days?
  • Seven workers
    wood Seven workers clear the glade in 22 hours. How many workers would need to be done in 8 hours?
  • Painting school
    painting Redecoration school had scheduled for four crew to 10 days. After two days a single worker ill. For how many days the school was painted when remain workers working with the same tempo?
  • Painting rooms
    palma If Dano paints three hours daily, he complete in 7.5 days. How many hours a day would have to work to finish the job 1.5 days earlier?
  • Shoemaker
    shoes Both the shoemaker and his apprentice repaired his shoes. The apprentice worked for 6 days and repaired 10 pairs of shoes every day. The shoemaker did the same job in 4 days. How many pairs of shoes did the shoemaker repair per day?
  • A lot of hay
    zajic Martin's grandfather weighed a lot of hay and calculated that for 15 rabbits, it last in 100 days. How many days will this lot be enough for 25 rabbits?
  • Machines 2
    machine 2 machines for 50 hours produces 2,000 products. How many machines need to buy to make in 30 hours 15,000 products?
  • Highway
    truck Six trucks will be used to build the roadside 18 days. After 3 days, two more trucks were sent to build. How long will it take for material move?
  • Hay bags
    krav 4 cows eat 16 hay bags in 5 days. How many bags will eat 5 cows in 7 days?
  • Working together
    workers Two people will do the work in 12 days. They worked together for 8 days. Then only one worked for 10 days. How many days would each of them do the work if he worked alone?
  • Five pumps
    nadrz The water tank is filled with two pumps in 48 minutes. How long would it take to fill it with 5 same pumps?
  • Three workers
    three_workers Three workers A, B, C have to work on a specific task. Workers A and B completed whole task in 14 days, B together with C for 23 days, A together with C for 13 days. How long it would take to complete the task every one of them alone? How long it would ta