Pumps

After the floods, four equally powerful pumps exhausted water from the flooded cellar in 6 hours. How many hours would take a drained out with three equally powerful pumps?

Correct result:

t =  8 h

Solution:

t=4 63=8 h



We would be pleased if you find an error in the word problem, spelling mistakes, or inaccuracies and send it to us. Thank you!






Showing 0 comments:
avatar




Tips to related online calculators
Do you want to convert time units like minutes to seconds?
Most natural application of trigonometry and trigonometric functions is a calculation of the triangles. Common and less common calculations of different types of triangles offers our triangle calculator. Word trigonometry comes from Greek and literally means triangle calculation.

Next similar math problems:

  • Pumps
    pumps Five pumps pumped 1,800 hl of water for 3 hours. How many hectoliters of water pump same two powerful pumps for six hours?
  • Five pumps
    nadrz_14 The water tank is filled with two pumps in 48 minutes. How long would it take to fill it with 5 same pumps?
  • Painting rooms
    palma_1 If Dano paint three hours daily given work he complete in 7.5 days. How many hours a day would have to work to finish the job 1.5 days earlier?
  • Pumps 3
    pump_water Two pumps of the same power fill the garden pool for 10 hours. How many of these pumps would have to use if we want to shorten the filling of the pool to four hours?
  • Pumps 5
    pump_1 5 pump pumped in 3 hours 1800 hl of water. How many hectoliters of water pumped 4 equally powerful pumps in 6 hours?
  • Five combers
    permutations_3 Five combers harvest 12 rows of strawberries in 4 hours. How many rows of strawberries will two combers harvest in 10 hours?
  • Diggers
    workers_1 The excavation was carried out in 4 days and 5 workers worked on it for 7 hours a day. Determine how long it would take to excavate if 7 workers worked on it 8 hours a day.
  • Eight masons
    time Eight masons will plaster a wall with an area of 1440 m2 in 9 days. They work 8 hours a day. How much area will plaster 6 masons in 4 hours?
  • Painters
    time Ten painters paint the school in 20 days. How many days do four painters paint the school at the same pace of work?
  • Lumberjacks
    stromy_17 Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if 5 workers added to it after 4 days?
  • Four workers
    wood_6 Four workers lay the gym floor in six hours. After an hour of working together, one of the workers went to the doctor. How long will it take for the remaining three workers to complete their work?
  • Working time
    work_1 At 10 hours work shift, work is done in 16 days. How many days will the work be done at 8 hours shifts?
  • Six workers
    workers Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do 7 workers earn in 10 days with the same daily average salary?
  • Book reading
    books_1 Susan thought, "If I read 15 pages a day, I will read the whole book in 8 days. “How many pages would she have to read a day if she wanted to finish the book on the 6th day from the start of reading? And how many pages does the book have?
  • Cable car
    lanovka The cable car will carry 1280 passengers in 40 minutes. How many people will be transported in 2.5 hours?
  • Cook on gas
    lpg The gas cylinder will last for 30 weekends for 2 hours of daily cooking. How many days will we be able to cook on a new cylinder when we cook 3 hours a day?
  • Pumps
    fuel_tank 6 pump fills the tank for 3 and a half days. How long will fill the tank 7 equally powerful pumps?