Chuck
Chuck Stone has 8 7/8 cubic yards of concrete in a truck. How much concrete remains in the truck if he unloads 2 1/2 cubic yards at the first stop, 3 cubic yards at the second stop, and 1 3/4 cubic yards at the third stop?
Final Answer:

Tips for related online calculators
Need help with mixed numbers? Try our mixed-number calculator.
You need to know the following knowledge to solve this word math problem:
arithmeticnumbersUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Unload truck
Andy has just moved and is beginning to unload his boxes. The truck is currently 11/12 of the way full. He unloads 1/4 more of it. How much more does he have to unload? - A delivery truck
A box delivery truck consumes 12 gallons of gasoline in three days. 2 4/5 gallons of gas is consumed on the first day, and three and 7/10 gallons are consumed on the second day. How much is consumed on the third day? - Mr Juma
Mr. Juma paid his workers as follows. He gave 1/6 to the first, 2/3 of the remainder to the second, and 2400 to the third worker. How much money did he have at the beginning? - Bullet game
Juro, Fero, and Michael played bullets. In the beginning, everyone had the same number. In the first game, Juro won 4 bullets, and Fero 5 (that means Michael lost nine bullets). Michael won 7 balls in the second game, and Fero lost four. Michael lost thre - Stone water lifting
How much force do we lift a stone in the water that weighs 30 kg and has a density of 2500 kg/m³? Gravitational acceleration g = 10 m/s². - Hiker
The hiker went on half of the trip on the first day, a third of the trip on the second day, and remains 24 km. How long was the trip he planned? - A dump
A dump truck bought 1/3 of a ton of rock on the first trip, 1/2 of a ton on the second trip, and 4/5 of a ton on the third trip. What was the total weight of the rock?
