Seven workers

Seven workers clear the glade in 22 hours. How many workers would need to be done in 8 hours?

Correct result:

n =  20

Solution:

n1=7 22/8=774=19.25 n=n1=19.25=20



We would be pleased if you find an error in the word problem, spelling mistakes, or inaccuracies and send it to us. Thank you!






Showing 0 comments:
avatar




Tips to related online calculators
Do you want to round the number?
Do you want to convert time units like minutes to seconds?

You need to know the following knowledge to solve this word math problem:

Next similar math problems:

  • Hectoliters of water
    pumps_7 The pool has a total of 126 hectoliters of water. The first pump draws 2.1 liters of water per second. A second pump pumps 3.5 liters of water per second. How long will it take both pumps to drain four-fifths of the water at the same time?
  • Apprentice
    ucen Worker and apprentice execute the work for 6 hours. Worker performs himself in 10 hours. How long do the work of an apprentice?
  • The field
    tractors 3 tractors plow the field in 6 hours. However, after 2 hours, 1 tractor broke down. How long will the field be plowed?
  • Eight hours
    clocks_15 Brigadier Franta ties a sheaf of hay in 20 minutes. Lujza in the same time only a quarter. How many sheaves will they tie together in 8 hours?
  • The tank
    pipe2_4 The tank had 9 inflows to be filled in 21 days. After 9 days, 3 trips out. How many days did the remaining 6 tributaries fill the tank?
  • Trucks
    truck_big Truck take you the some amount of clay in 30 hours. Second truck in 40 hours. Trucks carted the clay away some time together then the second truck broke down and the first one completed the job in five hours. What time worked together?
  • Four painters
    painter The company sent four painters to paint the school. They should be done in 12 days. After three days, one painter got ill. How long will the remaining painters paint the school?
  • 4 pipes
    roury The tank flows out by 4 pipes in 6 hours 120 hl water. How much water flows out of 5 pipes of the same diameter in 14 hours?
  • 5 pumps
    pump Five pump to pump 3 hours 1600 hl of water. How long pumped same amount of water 4 pumps?
  • Digging companies
    companies Company A would dig a pit for 12 days, company B for 15 days, company C for 20 days and the company D for 24 days. Work began together companies C and D, but after three days joined them other two companies. How long took to dig a pit?
  • Bricklayers
    delnik_4 When a bricklayer works himself to redeem the house in 8 days, the other bricklayer will be finished in 10 days. How long will it take to make 3 such houses together?
  • Painters 4
    painter_3 One painter will do the job for 12 days. After a 4 1/3 day he comes second to help him and complete work together for 8 days. How long would work the second painter himself?
  • Our house
    malovka_6 Our house would paint four painters in 14 days. How long could it paint five painters? How long will it take if two other painters will come to help after 5 days?
  • Six students
    painter Two pupils painted the class in four hours. How long will it take for six pupils?
  • Workers
    okno2_1 Group of workers washing half of the windows of the building in two hours. How long will take half the workers wash all the windows of the building?
  • Liquid soap
    mydlo Liquid soap lasted two weeks to one member of the family. How many days will last, if it use: a) two members b) 4 members c) seven members?
  • Digging
    digging The first worker would dig a trench in 6 hours. For the second, the same work would take 4 hours. How long did it take for the trench to be dug if they worked together?