Seven
Seven dwarfs will cut 420 stumps in 15 hours. After five hours, the two dwarves disappear discreetly. How many hours will the remaining dwarves complete the task?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Related math problems and questions:
- Kevin 3
Kevin makes a list of the tasks he has to do after school and how long it will take him to do each task. Task Time; (hours) Read ; 1/3 Do homework ; 3/4 Play soccer ; 4/6 Practice piano ; 1/2 How long will it take Kevin to complete all of his tasks? Show - Work
The first worker would need less than 4 hours to complete the task than the other worker. In fact, both workers worked for two hours together. Then the first worker did the remaining work himself. In what proportion should the remuneration of the workers - Four workers
Four workers lay on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take for the remaining three workers to complete their work? - Reassigned 82404
Five grinders grind 120 products in 12 hours. After 4 hours of work, another 11 grinders were reassigned to the workshop. Will he complete the entire job in 6 hours? - Master work
The master will complete the given task in 4 hours. How long will it take to master students entirely in three hours when they're done together? - Tractors
Five tractors will plow the field for 8 hours. In 2 hours, one tractor broke down. How long do the remaining tractors complete the plow? - Six workers
Six workers planned to repair the roof in 5 days. After two days, two workers get sick. How long will the remaining workers complete the roof at the same rate? - Complete 23811
We ordered two parties of workers to replace the windows and doors. The first group would complete the task in 15 days. The second in ten days. How many days will they be able to exchange it together? - Remaining 82419
Seven pavers would pave the square in 15 shifts. After five shifts, two pavers fell ill. How long will it take for the remaining pavers to finish the job? - Simultaneously 7748
The monitor screen is blank. Four new wheels appear on the screen every seven seconds when the beep sounds. On the contrary, three wheels disappear from the screen every eleven seconds. If both actions should take place simultaneously, the number of circl - Five tractors
Five tractors plow the fields in 4.8 hours. How long will it take to plow the field when, after an hour and a half of work, two tractor drivers have been called up for another task? - Performance 66764
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick. a) In how many more shifts did the masons complete the said plastering? b) In how many shifts was the assigned - Dwarves 37191
The dwarfs dragged Snow White in a coffin from the garden to the house as Snow White with the coffin was heavy. The dwarves pulled her with a speed of 0.2 m/s. The place where Snow White and the coffin were laid was 15000 cm away from the place in the hou - Improvements 70344
Two workers work equally efficiently and together can complete a given task in 5 hours. One worker improved his machine, changed his workflow, and increased his output by 40%. How long will it take both workers to complete the given task? - Complete 5584
The two workers dug together for 6 hours. The first worker would do the work himself in 14 hours. How long would it take for the second worker to complete the task? - Dwarfs
Four dwarfs would prepare firewood for Snow White in580 minutes. After an hour and a half, they recruited friends and finished preparing the wood for 280 minutes. How many dwarfs do they recruit? - Bricklayers
Seven bricklayers will build the house in 630 days. How many bricklayers do we need to take after 150 days to complete the building for (additional) 336 days?